A platform for research: civil engineering, architecture and urbanism
Formwork erecting and pouring construction method for light movable formwork of lock chamber wall
The invention relates to a lock chamber wall light movable formwork formwork erecting and pouring construction method which comprises the steps that a fixed supporting plate, a companding supporting rod, a lifting supporting plate and a back pressure air bag are sequentially arranged in a vertical supporting column from top to bottom, and a telescopic transverse supporting rib can be formed on the outer side of the vertical supporting column; a supporting box filling body and a supporting box inner plate are arranged in the column top supporting box at the top end of the vertical supporting column; two pairs of platform supporting beams are arranged between every two longitudinally adjacent support stand columns, and a platform supporting plate is arranged between every two pairs of platform supporting beams. The planes of the lower-layer supporting beam and the upper-layer supporting beam are U-shaped, and template position control bodies are arranged on the upper-layer supporting beam and the lower-layer supporting beam; limiting clamping grooves are formed in the top ends of the wall body inner mold and the wall body outer mold, end mold side tenons and end mold connecting holes are formed in the wall body end molds, and a temperature control water pipe is arranged on the wall body inner mold; downward pressure is applied to wall concrete through the wall top pressing plate, and redundant grout water is discharged through the grout overflow holes. The template arrangement difficulty can be reduced, and the wall concrete pouring quality is improved.
本申请涉及闸室墙轻型移动模架支模浇筑施工方法,该方案包括在竖向撑柱的内部自上向下依次设置固定撑板、压扩撑杆、升降撑板和反压气囊,并可在竖向撑柱外侧形成可伸缩的横向撑筋;在竖向撑柱顶端的柱顶撑箱内设置撑箱填充体和撑箱内板;在纵向相邻的两支架立柱之间设置两对平台撑梁,并在每对的两平台撑梁之间设置平台撑板;下层撑梁和上层撑梁平面呈“U”形,并在上层撑梁和下层撑梁上设置模板控位体;在墙体内模和墙体外模的顶端设置限位卡槽,并在墙体端模上设置端模侧隼和端模连孔,在墙体内模上设置控温水管;通过墙顶压板对墙体混凝土施加下压力,并通过浆液溢出孔排除多余的浆水。本申请可降低模板设置难度、提高墙体混凝土浇筑质量。
Formwork erecting and pouring construction method for light movable formwork of lock chamber wall
The invention relates to a lock chamber wall light movable formwork formwork erecting and pouring construction method which comprises the steps that a fixed supporting plate, a companding supporting rod, a lifting supporting plate and a back pressure air bag are sequentially arranged in a vertical supporting column from top to bottom, and a telescopic transverse supporting rib can be formed on the outer side of the vertical supporting column; a supporting box filling body and a supporting box inner plate are arranged in the column top supporting box at the top end of the vertical supporting column; two pairs of platform supporting beams are arranged between every two longitudinally adjacent support stand columns, and a platform supporting plate is arranged between every two pairs of platform supporting beams. The planes of the lower-layer supporting beam and the upper-layer supporting beam are U-shaped, and template position control bodies are arranged on the upper-layer supporting beam and the lower-layer supporting beam; limiting clamping grooves are formed in the top ends of the wall body inner mold and the wall body outer mold, end mold side tenons and end mold connecting holes are formed in the wall body end molds, and a temperature control water pipe is arranged on the wall body inner mold; downward pressure is applied to wall concrete through the wall top pressing plate, and redundant grout water is discharged through the grout overflow holes. The template arrangement difficulty can be reduced, and the wall concrete pouring quality is improved.
本申请涉及闸室墙轻型移动模架支模浇筑施工方法,该方案包括在竖向撑柱的内部自上向下依次设置固定撑板、压扩撑杆、升降撑板和反压气囊,并可在竖向撑柱外侧形成可伸缩的横向撑筋;在竖向撑柱顶端的柱顶撑箱内设置撑箱填充体和撑箱内板;在纵向相邻的两支架立柱之间设置两对平台撑梁,并在每对的两平台撑梁之间设置平台撑板;下层撑梁和上层撑梁平面呈“U”形,并在上层撑梁和下层撑梁上设置模板控位体;在墙体内模和墙体外模的顶端设置限位卡槽,并在墙体端模上设置端模侧隼和端模连孔,在墙体内模上设置控温水管;通过墙顶压板对墙体混凝土施加下压力,并通过浆液溢出孔排除多余的浆水。本申请可降低模板设置难度、提高墙体混凝土浇筑质量。
Formwork erecting and pouring construction method for light movable formwork of lock chamber wall
闸室墙轻型移动模架支模浇筑施工方法
SU YING (author) / QIAN YELIN (author) / LI ZHENBIAO (author) / LI CHANGCHUN (author) / YU MENG (author) / ZHENG JINHUI (author) / GUO LING (author) / CAO TINGTING (author) / GUO DACHUI (author) / ZHENG JUNYU (author)
2023-03-14
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|Wall single-side formwork erecting device and formwork erecting method
European Patent Office | 2022
|European Patent Office | 2022
|Shear wall integral movable formwork and pouring construction method thereof
European Patent Office | 2023
|