A platform for research: civil engineering, architecture and urbanism
Pavement anti-clogging drainage system
A road surface anti-clogging drainage system is installed in a green belt and extends into the edge of a road and a road edge stone, and comprises a frame, a garbage filtering and storing assembly hung in the frame, an overturning partition plate assembly hung on the side wall of the frame, an overturning cover plate arranged at the top of the frame and a lifting early warning assembly arranged at the bottom of the overturning cover plate. According to the device, when the garbage is not stacked to the preset height, the lifting early warning assembly is located at the bottom of the overturning cover plate, and when the garbage stored in the garbage filtering and storing assembly is stacked to the preset height, the garbage at the top pushes the lifting early warning assembly to ascend, so that the top of the lifting early warning assembly protrudes out of the avoiding hole, and the garbage is discharged from the overturning cover plate; therefore, a sanitation worker is reminded to open the overturning cover plate and take the garbage filtering and storing assembly out of the frame so as to clean garbage accumulated in the garbage filtering and storing assembly, clogging of a sewer can be effectively avoided, the maximum drainage capacity of an underground pipe network can be fully played, and the maintenance cost of the underground pipe network can be reduced.
一种路面防淤堵排水系统,安装于绿化带内且延伸至道路边缘和路沿石中,包括框架,挂设于框架内部的垃圾过滤存储组件,挂设于框架侧壁上的翻转隔板组件,设于框架顶部的翻转盖板,以及设于翻转盖板底部的升降预警组件。本发明中,当垃圾未堆积至预设高度时,升降预警组件位于所述翻转盖板的底部,当所述垃圾过滤存储组件中存储的垃圾堆积至预设高度时,顶部的垃圾推动所述升降预警组件上升,以使升降预警组件的顶部从所述避让孔中突出,从而提醒环卫工人将所述翻转盖板打开,将所述垃圾过滤存储组件从所述框架中取出,以对其中堆积的垃圾进行清理,即能够有效地避免下水道的淤堵,充分发挥地下管网的最大排水能力,又能降低地下管网的维护成本。
Pavement anti-clogging drainage system
A road surface anti-clogging drainage system is installed in a green belt and extends into the edge of a road and a road edge stone, and comprises a frame, a garbage filtering and storing assembly hung in the frame, an overturning partition plate assembly hung on the side wall of the frame, an overturning cover plate arranged at the top of the frame and a lifting early warning assembly arranged at the bottom of the overturning cover plate. According to the device, when the garbage is not stacked to the preset height, the lifting early warning assembly is located at the bottom of the overturning cover plate, and when the garbage stored in the garbage filtering and storing assembly is stacked to the preset height, the garbage at the top pushes the lifting early warning assembly to ascend, so that the top of the lifting early warning assembly protrudes out of the avoiding hole, and the garbage is discharged from the overturning cover plate; therefore, a sanitation worker is reminded to open the overturning cover plate and take the garbage filtering and storing assembly out of the frame so as to clean garbage accumulated in the garbage filtering and storing assembly, clogging of a sewer can be effectively avoided, the maximum drainage capacity of an underground pipe network can be fully played, and the maintenance cost of the underground pipe network can be reduced.
一种路面防淤堵排水系统,安装于绿化带内且延伸至道路边缘和路沿石中,包括框架,挂设于框架内部的垃圾过滤存储组件,挂设于框架侧壁上的翻转隔板组件,设于框架顶部的翻转盖板,以及设于翻转盖板底部的升降预警组件。本发明中,当垃圾未堆积至预设高度时,升降预警组件位于所述翻转盖板的底部,当所述垃圾过滤存储组件中存储的垃圾堆积至预设高度时,顶部的垃圾推动所述升降预警组件上升,以使升降预警组件的顶部从所述避让孔中突出,从而提醒环卫工人将所述翻转盖板打开,将所述垃圾过滤存储组件从所述框架中取出,以对其中堆积的垃圾进行清理,即能够有效地避免下水道的淤堵,充分发挥地下管网的最大排水能力,又能降低地下管网的维护成本。
Pavement anti-clogging drainage system
一种路面防淤堵排水系统
GU JIANGUO (author) / YOU SHIHUI (author) / REN JUNGANG (author) / YANG JUNYAN (author) / ZHANG SHENGDONG (author)
2023-03-14
Patent
Electronic Resource
Chinese
IPC:
E03F
SEWERS
,
Abwasserkanäle
Anti-clogging drainage equipment for bathroom drainage port
European Patent Office | 2021
|