A platform for research: civil engineering, architecture and urbanism
Fabricated net rack system and assembly construction method thereof
The invention relates to an assembly type net rack system and an assembly construction method thereof, and belongs to the technical field of steel structure construction. Comprising a spherical joint, the lifting frame comprises a first clamp and a second clamp which are arranged on a horizontal connecting rod in a sleeving mode, a first connecting rod is hinged to the first clamp, a second connecting rod is hinged to the second clamp, and the other end of the first connecting rod and the other end of the second connecting rod are hinged to the two ends of a middle horizontal rod respectively. A third connecting rod symmetrical to the first connecting rod is hinged to the middle horizontal rod, a fourth connecting rod symmetrical to the second connecting rod is hinged to the middle horizontal rod, a third clamping hoop is hinged to the other end of the third connecting rod, and a fourth clamping hoop is hinged to the other end of the fourth connecting rod. The third clamp and the fourth clamp are both arranged on the main fire fighting pipe in a sleeving mode. The fire-fighting main pipe mounting device has the following beneficial effects that the possibility of uniform stress of the spherical net rack is improved while the fire-fighting main pipe is convenient to mount.
本发明涉及一种装配式网架系统及其装配施工方法,属于钢结构施工技术领域。包括球形节点,所述吊装架包括套设在水平连接杆上的第一卡箍和第二卡箍,所述第一卡箍上铰接有第一连杆,所述第二卡箍上铰接有第二连杆,所述第一连杆和第二连杆的另一端分别与中部水平杆的两端相铰接,所述中部水平杆上铰接有与第一连杆对称的第三连杆,所述中部水平杆上铰接有与第二连杆对称的第四连杆,所述第三连杆的另一端铰接有第三卡箍,所述第四连杆的另一端铰接有第四卡箍,所述第三卡箍和第四卡箍均套设在消防主管上。本发明具有以下有益效果:在便于对消防主管进行安装的同时,提高球形网架均匀受力的可能性。
Fabricated net rack system and assembly construction method thereof
The invention relates to an assembly type net rack system and an assembly construction method thereof, and belongs to the technical field of steel structure construction. Comprising a spherical joint, the lifting frame comprises a first clamp and a second clamp which are arranged on a horizontal connecting rod in a sleeving mode, a first connecting rod is hinged to the first clamp, a second connecting rod is hinged to the second clamp, and the other end of the first connecting rod and the other end of the second connecting rod are hinged to the two ends of a middle horizontal rod respectively. A third connecting rod symmetrical to the first connecting rod is hinged to the middle horizontal rod, a fourth connecting rod symmetrical to the second connecting rod is hinged to the middle horizontal rod, a third clamping hoop is hinged to the other end of the third connecting rod, and a fourth clamping hoop is hinged to the other end of the fourth connecting rod. The third clamp and the fourth clamp are both arranged on the main fire fighting pipe in a sleeving mode. The fire-fighting main pipe mounting device has the following beneficial effects that the possibility of uniform stress of the spherical net rack is improved while the fire-fighting main pipe is convenient to mount.
本发明涉及一种装配式网架系统及其装配施工方法,属于钢结构施工技术领域。包括球形节点,所述吊装架包括套设在水平连接杆上的第一卡箍和第二卡箍,所述第一卡箍上铰接有第一连杆,所述第二卡箍上铰接有第二连杆,所述第一连杆和第二连杆的另一端分别与中部水平杆的两端相铰接,所述中部水平杆上铰接有与第一连杆对称的第三连杆,所述中部水平杆上铰接有与第二连杆对称的第四连杆,所述第三连杆的另一端铰接有第三卡箍,所述第四连杆的另一端铰接有第四卡箍,所述第三卡箍和第四卡箍均套设在消防主管上。本发明具有以下有益效果:在便于对消防主管进行安装的同时,提高球形网架均匀受力的可能性。
Fabricated net rack system and assembly construction method thereof
装配式网架系统及其装配施工方法
LI PING (author) / ZHANG QUAN (author) / WANG JIWEI (author) / KONG TAO (author) / ZHU BIN (author)
2023-03-14
Patent
Electronic Resource
Chinese
Cross-floor assembly type net rack construction platform and construction method thereof
European Patent Office | 2024
|Detachable construction external hanging rack assembly and mounting method thereof
European Patent Office | 2024
|Fabricated prefabricated assembly and construction method thereof
European Patent Office | 2021
|