A platform for research: civil engineering, architecture and urbanism
Fabricated building bin sealing device and construction method
The invention discloses an assembly type building bin sealing device and a construction method. The assembly type building bin sealing device comprises a clamp and a pipe body, and a through hole communicating with the pipe body is formed in the clamp; the clamp comprises a first plate, a second plate and a third plate which are connected in sequence, the connecting angle of the first plate and the second plate is 90 degrees, the first plate, the second plate and the third plate form a material containing space, and one end of the material containing space is open; the follow-up grouting device is simple in structure, capable of being repeatedly used and convenient to use, a traditional plastering and slurry plugging mode is changed, the operation difficulty is reduced through a follow-up grouting mode, the concrete forming quality after injection is good, the construction efficiency and speed can be effectively improved, the bin sealing quality is improved, and the cost is reduced.
本发明公开了一种装配式建筑封仓装置及施工方法,包括:卡具和管体,所述卡具上开设有与管体连通的通孔;所述卡具包括依次连接的第一板、第二板和第三板,所述第一板和第二板的连接角度为90°,所述第一板、第二板和第三板构成容料空间,所述容料空间一端为敞口状;本发明中,结构简单,可反复使用,使用方便,改变了传统的抹浆、塞浆方式,通过跟随注浆的方式,降低了操作的难度,且注入后的混凝土成型质量好,可有效提高施工效率和速度,提升封仓质量、降低了成本。
Fabricated building bin sealing device and construction method
The invention discloses an assembly type building bin sealing device and a construction method. The assembly type building bin sealing device comprises a clamp and a pipe body, and a through hole communicating with the pipe body is formed in the clamp; the clamp comprises a first plate, a second plate and a third plate which are connected in sequence, the connecting angle of the first plate and the second plate is 90 degrees, the first plate, the second plate and the third plate form a material containing space, and one end of the material containing space is open; the follow-up grouting device is simple in structure, capable of being repeatedly used and convenient to use, a traditional plastering and slurry plugging mode is changed, the operation difficulty is reduced through a follow-up grouting mode, the concrete forming quality after injection is good, the construction efficiency and speed can be effectively improved, the bin sealing quality is improved, and the cost is reduced.
本发明公开了一种装配式建筑封仓装置及施工方法,包括:卡具和管体,所述卡具上开设有与管体连通的通孔;所述卡具包括依次连接的第一板、第二板和第三板,所述第一板和第二板的连接角度为90°,所述第一板、第二板和第三板构成容料空间,所述容料空间一端为敞口状;本发明中,结构简单,可反复使用,使用方便,改变了传统的抹浆、塞浆方式,通过跟随注浆的方式,降低了操作的难度,且注入后的混凝土成型质量好,可有效提高施工效率和速度,提升封仓质量、降低了成本。
Fabricated building bin sealing device and construction method
一种装配式建筑封仓装置及施工方法
ZHANG SIDA (author) / WANG LONG (author) / CHEN ZE (author) / ZHOU KUN (author) / LI JUNHONG (author)
2023-03-14
Patent
Electronic Resource
Chinese
Fabricated building sealing waterproof construction system
European Patent Office | 2020
|Connecting seam sealing device for fabricated building construction and sealing method thereof
European Patent Office | 2021
|Fabricated building outer wall joint sealing waterproof construction device
European Patent Office | 2024
|Fabricated building outer wall joint sealing waterproof construction device
European Patent Office | 2023
|