A platform for research: civil engineering, architecture and urbanism
Climbing method for attached discharging platform
The invention provides an attached type unloading platform climbing method, and relates to the field of unloading platform climbing technology construction, and the attached type unloading platform climbing method comprises an upper hanging bracket, a lower hanging bracket, an electric hoist, a vertical guide rail, a chain and an M16 bolt. The hanger and the concrete are fixed in place, and the chain is tensioned by the electric hoists, so that the stress conditions of the hoists are basically consistent. The lifting chain is pre-tightened, the conditions of a lifting point, a guide rail and an electric hoist are checked, and the attached lifting scaffolds of the whole building are lifted together during lifting. By means of the attachment supporting structure arranged on the engineering structure and the synchronous lifting device of the attachment supporting structure, assembly and disassembly are convenient, the construction speed is high, and the material pouring construction period of workers can be effectively shortened.
本发明提供种附着式卸料平台爬升方法,涉及卸料平台爬升技术施工领域,包括上吊架,下吊架,电动葫芦,竖向导轨,链条,M16螺栓。吊挂件与混凝土固定到位,电动葫芦张紧链条,使每个葫芦的受力情况基本一致。预紧提升链条,检查吊点、导轨、电动葫芦情况,提升时整栋楼的附着式升降脚手架一齐提升。本发明实现了通过设置在工程结构上的附着支承结构,并依靠自身的同步升降设备,且安拆方便,施工速度快,可以有效的缩短工人倒料的施工工期。
Climbing method for attached discharging platform
The invention provides an attached type unloading platform climbing method, and relates to the field of unloading platform climbing technology construction, and the attached type unloading platform climbing method comprises an upper hanging bracket, a lower hanging bracket, an electric hoist, a vertical guide rail, a chain and an M16 bolt. The hanger and the concrete are fixed in place, and the chain is tensioned by the electric hoists, so that the stress conditions of the hoists are basically consistent. The lifting chain is pre-tightened, the conditions of a lifting point, a guide rail and an electric hoist are checked, and the attached lifting scaffolds of the whole building are lifted together during lifting. By means of the attachment supporting structure arranged on the engineering structure and the synchronous lifting device of the attachment supporting structure, assembly and disassembly are convenient, the construction speed is high, and the material pouring construction period of workers can be effectively shortened.
本发明提供种附着式卸料平台爬升方法,涉及卸料平台爬升技术施工领域,包括上吊架,下吊架,电动葫芦,竖向导轨,链条,M16螺栓。吊挂件与混凝土固定到位,电动葫芦张紧链条,使每个葫芦的受力情况基本一致。预紧提升链条,检查吊点、导轨、电动葫芦情况,提升时整栋楼的附着式升降脚手架一齐提升。本发明实现了通过设置在工程结构上的附着支承结构,并依靠自身的同步升降设备,且安拆方便,施工速度快,可以有效的缩短工人倒料的施工工期。
Climbing method for attached discharging platform
一种附着式卸料平台爬升方法
LI DAICHENG (author) / WEI PENGFEI (author) / XU JUN (author)
2023-03-14
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
Electric early-warning self-climbing discharging platform
European Patent Office | 2024
|