A platform for research: civil engineering, architecture and urbanism
Electromechanical pipeline concealed installation structure of pseudo-classic architecture and construction method
The electromechanical pipeline concealed installation structure is characterized in that second longitudinal beam assemblies are arranged between two second stand columns and two third stand columns, and cross beam assemblies are arranged between the second stand columns and the third stand columns; the bottoms of the supporting plates between the second stand columns and the third stand columns are fixedly connected with two second limiting plates connected with the first I-shaped steel in a clamped mode, the tops of the two supporting plates are fixedly connected with the same gable slope, a plurality of grid bars are arranged between the gable slopes, and a first longitudinal beam assembly is arranged between the two first stand columns located on the side. Tiles are erected on the grid bars, and one side of each tile extends to one side of the corresponding first longitudinal beam assembly. The two second longitudinal beam assemblies are provided with the same caisson, bosses are arranged below the second longitudinal beam assemblies, concave plates are arranged at the tops of the bosses, and supporting columns are fixedly connected between the concave plates and the second longitudinal beam assemblies; the mounting structure can effectively hide the electromechanical pipeline, is beneficial to beautifying the pseudo-classic architecture, and is convenient for assembly and later pipeline maintenance.
本发明涉及一种仿古建筑的机电管线隐蔽安装结构,两个第二立柱和两个第三立柱之间均设有第二纵梁总成,第二立柱和第三立柱之间设有横梁总成,第二立柱和第三立柱之间支撑板的底部固定连接有两个与第一工字钢卡接的第二限位板,两个支撑板的顶部固定连接有同一个山墙坡,山墙坡与山墙坡之间设有多个栅条,位于边侧的两个第一立柱之间设有第一纵梁总成,多个栅条上搭设有瓦作,瓦作的一侧延伸至第一纵梁总成的一侧;两个第二纵梁总成上设有同一个藻井,第二纵梁总成的下方设有凸台,凸台的顶部设有凹形板,凹形板与第二纵梁总成之间固定连接有支撑柱;该安装结构可以有效将机电管线隐藏,有利于美化仿古建筑,并且便于装配以及后期管线维护。
Electromechanical pipeline concealed installation structure of pseudo-classic architecture and construction method
The electromechanical pipeline concealed installation structure is characterized in that second longitudinal beam assemblies are arranged between two second stand columns and two third stand columns, and cross beam assemblies are arranged between the second stand columns and the third stand columns; the bottoms of the supporting plates between the second stand columns and the third stand columns are fixedly connected with two second limiting plates connected with the first I-shaped steel in a clamped mode, the tops of the two supporting plates are fixedly connected with the same gable slope, a plurality of grid bars are arranged between the gable slopes, and a first longitudinal beam assembly is arranged between the two first stand columns located on the side. Tiles are erected on the grid bars, and one side of each tile extends to one side of the corresponding first longitudinal beam assembly. The two second longitudinal beam assemblies are provided with the same caisson, bosses are arranged below the second longitudinal beam assemblies, concave plates are arranged at the tops of the bosses, and supporting columns are fixedly connected between the concave plates and the second longitudinal beam assemblies; the mounting structure can effectively hide the electromechanical pipeline, is beneficial to beautifying the pseudo-classic architecture, and is convenient for assembly and later pipeline maintenance.
本发明涉及一种仿古建筑的机电管线隐蔽安装结构,两个第二立柱和两个第三立柱之间均设有第二纵梁总成,第二立柱和第三立柱之间设有横梁总成,第二立柱和第三立柱之间支撑板的底部固定连接有两个与第一工字钢卡接的第二限位板,两个支撑板的顶部固定连接有同一个山墙坡,山墙坡与山墙坡之间设有多个栅条,位于边侧的两个第一立柱之间设有第一纵梁总成,多个栅条上搭设有瓦作,瓦作的一侧延伸至第一纵梁总成的一侧;两个第二纵梁总成上设有同一个藻井,第二纵梁总成的下方设有凸台,凸台的顶部设有凹形板,凹形板与第二纵梁总成之间固定连接有支撑柱;该安装结构可以有效将机电管线隐藏,有利于美化仿古建筑,并且便于装配以及后期管线维护。
Electromechanical pipeline concealed installation structure of pseudo-classic architecture and construction method
一种仿古建筑的机电管线隐蔽安装结构及施工方法
WANG XIAOLIN (author) / ZHANG MING (author) / CAO WENGEN (author) / LI ZI'ANG (author) / YANG XU (author) / LIU TIANAN (author) / WANG WEI (author) / ZHAO QIANG (author) / YANG YUSHENG (author) / CHEN RUI (author)
2023-03-17
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
/
E04G
SCAFFOLDING
,
Baugerüste
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
Pseudo-classic architecture copper bracket prefabrication and installation method
European Patent Office | 2021
|Pseudo-classic architecture integrated decorative curtain wall structure and installation equipment
European Patent Office | 2023
|European Patent Office | 2024
|Pseudo-classic architecture roof mounting structure and construction process
European Patent Office | 2022
|