A platform for research: civil engineering, architecture and urbanism
Green construction device and construction method for bridge guardrail prefabrication and installation
The invention discloses a green construction device for bridge guardrail prefabrication and installation and a construction method, and belongs to the technical field of bridge guardrail construction.The green construction device comprises a frame, an automatic guardrail discharging mechanism, a horizontal moving mechanism, an installation lifting mechanism and an installation adjusting mechanism; the automatic guardrail discharging mechanisms are located in the carriage and arranged in the carriage at equal intervals, a mounting frame is arranged at one end of the carriage, the horizontal moving mechanism is arranged on the mounting frame, and the mounting lifting mechanism is connected to the horizontal moving mechanism and located at the bottom of the horizontal moving mechanism. The number of the installation adjusting mechanisms is two, the two installation adjusting mechanisms are arranged at the two ends of the bottom of the installation lifting mechanism correspondingly, and each installation adjusting mechanism is provided with an installation taking and placing mechanism. According to the adjustable bridge guardrail, the bridge guardrail can be adjusted to the angle matched with the slope surface, the bridge guardrail can be conveniently placed on the inclined slope surface subsequently, and mounting of the bridge guardrail is facilitated.
本发明公开了一种桥梁护栏预制安装的绿色施工装置及施工方法,属于桥梁护栏施工技术领域,包括车架、护栏自动下料机构、水平移动机构、安装升降机构和安装调节机构,所述车架上设有车厢,所述护栏自动下料机构位于车厢内且护栏自动下料机构等间距设置在车厢内,所述车厢上的一端设有安装架,所述水平移动机构设置在安装架上,所述安装升降机构连接在水平移动机构上,所述安装升降机构位于水平移动机构的底部,所述安装调节机构设有两个,两个所述安装调节机构分别设置在安装升降机构的底部两端,每个所述安装调节机构上均设有安装取放机构。本发明可以实现将桥梁护栏调节至与坡面相适应的角度,方便后续将桥梁护栏放置在有倾斜的坡面上,方便对桥梁护栏的安装。
Green construction device and construction method for bridge guardrail prefabrication and installation
The invention discloses a green construction device for bridge guardrail prefabrication and installation and a construction method, and belongs to the technical field of bridge guardrail construction.The green construction device comprises a frame, an automatic guardrail discharging mechanism, a horizontal moving mechanism, an installation lifting mechanism and an installation adjusting mechanism; the automatic guardrail discharging mechanisms are located in the carriage and arranged in the carriage at equal intervals, a mounting frame is arranged at one end of the carriage, the horizontal moving mechanism is arranged on the mounting frame, and the mounting lifting mechanism is connected to the horizontal moving mechanism and located at the bottom of the horizontal moving mechanism. The number of the installation adjusting mechanisms is two, the two installation adjusting mechanisms are arranged at the two ends of the bottom of the installation lifting mechanism correspondingly, and each installation adjusting mechanism is provided with an installation taking and placing mechanism. According to the adjustable bridge guardrail, the bridge guardrail can be adjusted to the angle matched with the slope surface, the bridge guardrail can be conveniently placed on the inclined slope surface subsequently, and mounting of the bridge guardrail is facilitated.
本发明公开了一种桥梁护栏预制安装的绿色施工装置及施工方法,属于桥梁护栏施工技术领域,包括车架、护栏自动下料机构、水平移动机构、安装升降机构和安装调节机构,所述车架上设有车厢,所述护栏自动下料机构位于车厢内且护栏自动下料机构等间距设置在车厢内,所述车厢上的一端设有安装架,所述水平移动机构设置在安装架上,所述安装升降机构连接在水平移动机构上,所述安装升降机构位于水平移动机构的底部,所述安装调节机构设有两个,两个所述安装调节机构分别设置在安装升降机构的底部两端,每个所述安装调节机构上均设有安装取放机构。本发明可以实现将桥梁护栏调节至与坡面相适应的角度,方便后续将桥梁护栏放置在有倾斜的坡面上,方便对桥梁护栏的安装。
Green construction device and construction method for bridge guardrail prefabrication and installation
一种桥梁护栏预制安装的绿色施工装置及施工方法
CAO HUI (author) / WANG KUNPENG (author) / WEI HAOCHENG (author) / WEI YUANBO (author) / CUI SHIGANG (author) / ZHENG SHUCHAO (author) / ZHOU HUIZHONG (author) / SUN ZHANHONG (author) / FAN XUYUN (author) / SUN XIQI (author)
2023-03-21
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Bridge padstone prefabrication and installation construction method
European Patent Office | 2022
|Anti-collision guardrail matching prefabrication construction process
European Patent Office | 2021
|Movable formwork installation construction method for bridge guardrail
European Patent Office | 2022
|Curb prefabrication and installation construction method
European Patent Office | 2024
|