Tailing pond seepage interception dam engineering construction method
A tailing pond seepage interception dam engineering construction method comprises the steps of early-stage preparation, seepage interception dam construction, tail water channel construction, seepage water collection pool construction, curtain grouting and test detection, and the tailing pond seepage interception dam engineering construction process comprises the steps of early-stage preparation, seepage water collection pool construction, curtain grouting, tail water channel construction, seepage interception dam construction, seepage water collection pool construction and curtain grouting at the same time. The method has the beneficial effects that the construction difficulty is reduced, the construction progress is accelerated, the construction time is shortened, the seepage interception dam is more stable in structure, high in density, high in strength and good in seepage interception performance, the later repair work of the seepage interception dam is reduced, the service life of the seepage interception dam is prolonged, and the economic benefits are outstanding.
一种尾矿库截渗坝工程施工方法,包括前期准备、截渗坝、尾水渠、渗水收集池、帷幕灌浆、试验检测,所述的尾矿库截渗坝工程施工流程如下:前期准备→渗水收集池→帷幕灌浆→尾水渠→截渗坝,渗水收集池和帷幕灌浆同时进行,尾水渠在帷幕灌浆之后进行,试验检测贯穿整个施工过程,本发明的有益效果:降低施工难度,提高施工进度,缩短施工时间,截渗坝结构更加稳固,密度高,强度高,截渗性能好,减少截渗坝后期的修复工作,增加截渗坝使用寿命,经济效益突出。
Tailing pond seepage interception dam engineering construction method
A tailing pond seepage interception dam engineering construction method comprises the steps of early-stage preparation, seepage interception dam construction, tail water channel construction, seepage water collection pool construction, curtain grouting and test detection, and the tailing pond seepage interception dam engineering construction process comprises the steps of early-stage preparation, seepage water collection pool construction, curtain grouting, tail water channel construction, seepage interception dam construction, seepage water collection pool construction and curtain grouting at the same time. The method has the beneficial effects that the construction difficulty is reduced, the construction progress is accelerated, the construction time is shortened, the seepage interception dam is more stable in structure, high in density, high in strength and good in seepage interception performance, the later repair work of the seepage interception dam is reduced, the service life of the seepage interception dam is prolonged, and the economic benefits are outstanding.
一种尾矿库截渗坝工程施工方法,包括前期准备、截渗坝、尾水渠、渗水收集池、帷幕灌浆、试验检测,所述的尾矿库截渗坝工程施工流程如下:前期准备→渗水收集池→帷幕灌浆→尾水渠→截渗坝,渗水收集池和帷幕灌浆同时进行,尾水渠在帷幕灌浆之后进行,试验检测贯穿整个施工过程,本发明的有益效果:降低施工难度,提高施工进度,缩短施工时间,截渗坝结构更加稳固,密度高,强度高,截渗性能好,减少截渗坝后期的修复工作,增加截渗坝使用寿命,经济效益突出。
Tailing pond seepage interception dam engineering construction method
一种尾矿库截渗坝工程施工方法
BIAN CHAO (author) / SHIKUMI HIKARU (author) / LI RUIDA (author) / JIA JIFENG (author)
2023-03-21
Patent
Electronic Resource
Chinese
European Patent Office | 2022
|Phosphogypsum weak tailing pond seepage drainage construction method
European Patent Office | 2024
|Tailing pond soft beach face seepage drainage system, tailing pond and application
European Patent Office | 2021
|