A platform for research: civil engineering, architecture and urbanism
Basement bottom plate post-cast strip construction method and device
The invention discloses a basement bottom plate post-cast strip construction method and a construction device thereof.The construction method comprises the following steps that firstly, a first bottom layer reinforcing mesh is laid on a bottom plate foundation layer, the bottom plate foundation layer comprises a post-cast area and two pre-cast areas, and the first bottom layer reinforcing mesh is laid in the pre-cast areas; 2, steel wire mesh frames are installed on the two sides of the post-pouring area on the bottom plate foundation layer; 3, a supporting frame is arranged in the pre-pouring area, and a first upper-layer reinforcing mesh is laid; 4, concrete is poured in the pre-pouring area; 5, the post-pouring area is covered with a protective cover; 6, after the concrete in the pre-pouring area is cured, the protective cover is taken down; 7, a post-pouring area is cleaned; 8, a second bottom-layer reinforcing mesh and a second upper-layer reinforcing mesh are installed in the post-pouring area; and 9, concrete is poured in the post-pouring area, before the post-pouring area is cleaned, a reinforcing mesh is not arranged in the post-pouring area, concrete chiseling work cannot be hindered, and therefore loose concrete blocks and protruding concrete blocks can be chiseled away conveniently.
本申请公开了一种地下室底板后浇带施工方法及其施工装置,其施工方法包括如下步骤:步骤1、在底板基础层上铺设底层钢筋网一,底板基础层包括后浇区和两先浇区,底层钢筋网一铺设在先浇区;步骤2、在底板基础层于后浇区两侧均安装钢丝网框;步骤3、在先浇区内设置支撑架并铺设上层钢筋网一;步骤4、在先浇区内浇筑混凝土;步骤5、利用保护盖遮盖后浇区;步骤6、待先浇区的混凝土养护完毕后,取下保护盖;步骤7、清理后浇区;步骤8、在后浇区内安装底层钢筋网二和上层钢筋网二;步骤9、在后浇区内浇筑混凝土,本申请在清理后浇区之前,未在后浇区中布置钢筋网,不会对混凝土凿除工作凿除造成阻碍,从而便于凿除松散混凝土块和较为突出的混凝土块。
Basement bottom plate post-cast strip construction method and device
The invention discloses a basement bottom plate post-cast strip construction method and a construction device thereof.The construction method comprises the following steps that firstly, a first bottom layer reinforcing mesh is laid on a bottom plate foundation layer, the bottom plate foundation layer comprises a post-cast area and two pre-cast areas, and the first bottom layer reinforcing mesh is laid in the pre-cast areas; 2, steel wire mesh frames are installed on the two sides of the post-pouring area on the bottom plate foundation layer; 3, a supporting frame is arranged in the pre-pouring area, and a first upper-layer reinforcing mesh is laid; 4, concrete is poured in the pre-pouring area; 5, the post-pouring area is covered with a protective cover; 6, after the concrete in the pre-pouring area is cured, the protective cover is taken down; 7, a post-pouring area is cleaned; 8, a second bottom-layer reinforcing mesh and a second upper-layer reinforcing mesh are installed in the post-pouring area; and 9, concrete is poured in the post-pouring area, before the post-pouring area is cleaned, a reinforcing mesh is not arranged in the post-pouring area, concrete chiseling work cannot be hindered, and therefore loose concrete blocks and protruding concrete blocks can be chiseled away conveniently.
本申请公开了一种地下室底板后浇带施工方法及其施工装置,其施工方法包括如下步骤:步骤1、在底板基础层上铺设底层钢筋网一,底板基础层包括后浇区和两先浇区,底层钢筋网一铺设在先浇区;步骤2、在底板基础层于后浇区两侧均安装钢丝网框;步骤3、在先浇区内设置支撑架并铺设上层钢筋网一;步骤4、在先浇区内浇筑混凝土;步骤5、利用保护盖遮盖后浇区;步骤6、待先浇区的混凝土养护完毕后,取下保护盖;步骤7、清理后浇区;步骤8、在后浇区内安装底层钢筋网二和上层钢筋网二;步骤9、在后浇区内浇筑混凝土,本申请在清理后浇区之前,未在后浇区中布置钢筋网,不会对混凝土凿除工作凿除造成阻碍,从而便于凿除松散混凝土块和较为突出的混凝土块。
Basement bottom plate post-cast strip construction method and device
一种地下室底板后浇带施工方法及其施工装置
YU YANG (author) / ZHOU KAIMING (author) / ZHOU KUN (author) / YANG JIAN (author) / LIU CHAO (author) / ZHANG TONG (author) / TAN SHILONG (author)
2023-03-24
Patent
Electronic Resource
Chinese
Basement bottom plate post-cast strip dewatering construction method
European Patent Office | 2024
|Basement bottom plate post-cast strip fabricated formwork construction method
European Patent Office | 2024
|Basement bottom plate post-cast strip and construction method thereof
European Patent Office | 2023
|Cleaning device in basement bottom plate post-cast strip and construction method
European Patent Office | 2023
|Basement bottom plate post-cast strip sealing structure and construction method
European Patent Office | 2024
|