A platform for research: civil engineering, architecture and urbanism
Civil construction foundation pit anti-sloughing supporting device and using method
The invention relates to the technical field of foundation pit collapse prevention, in particular to a civil construction foundation pit collapse prevention supporting device and a using method.The civil construction foundation pit collapse prevention supporting device comprises two plate bodies, first supporting assemblies are installed at the two ends of the plate bodies in a lifting mode, second supporting assemblies are rotatably installed at the bottoms of the plate bodies, and storage boxes are arranged on the two sides of the tops of the plate bodies; and air bag curtain cloth for keeping off rain is arranged in the storage box. Through the arrangement of the air bag curtain cloth, on one hand, the foundation pit can be sheltered from rain, on the other hand, a rain sheltering place can be provided for technicians in a short time, and the situation that the technicians get ill due to the fact that clothes of the technicians are wetted by rainwater in the construction process is prevented; rainwater can be effectively guided to the two sides of the foundation pit, and the situation that water is accumulated in the foundation pit is reduced.
本发明涉及基坑防塌技术领域,具体的是一种土木施工基坑防塌支护装置及使用方法,本发明包括两个板体,所述板体的两端均升降安装有第一支护组件,板体的底部转动安装有第二支护组件,板体的顶部两侧均设置有收纳盒,收纳盒内设置有用于挡雨的气囊帘布。本发明通过气囊帘布的设置,一方面能够对基坑进行遮雨的作用,另一方面也能够为技术人员在短期内提供一个避雨的场所,防止技术人员在施工的过程中因被雨水淋湿衣物而生病的情况出现,其次,通过气囊帘布的遮挡作用,能够有效的将雨水引导至基坑的两侧,减少基坑内出现积水的情况发生。
Civil construction foundation pit anti-sloughing supporting device and using method
The invention relates to the technical field of foundation pit collapse prevention, in particular to a civil construction foundation pit collapse prevention supporting device and a using method.The civil construction foundation pit collapse prevention supporting device comprises two plate bodies, first supporting assemblies are installed at the two ends of the plate bodies in a lifting mode, second supporting assemblies are rotatably installed at the bottoms of the plate bodies, and storage boxes are arranged on the two sides of the tops of the plate bodies; and air bag curtain cloth for keeping off rain is arranged in the storage box. Through the arrangement of the air bag curtain cloth, on one hand, the foundation pit can be sheltered from rain, on the other hand, a rain sheltering place can be provided for technicians in a short time, and the situation that the technicians get ill due to the fact that clothes of the technicians are wetted by rainwater in the construction process is prevented; rainwater can be effectively guided to the two sides of the foundation pit, and the situation that water is accumulated in the foundation pit is reduced.
本发明涉及基坑防塌技术领域,具体的是一种土木施工基坑防塌支护装置及使用方法,本发明包括两个板体,所述板体的两端均升降安装有第一支护组件,板体的底部转动安装有第二支护组件,板体的顶部两侧均设置有收纳盒,收纳盒内设置有用于挡雨的气囊帘布。本发明通过气囊帘布的设置,一方面能够对基坑进行遮雨的作用,另一方面也能够为技术人员在短期内提供一个避雨的场所,防止技术人员在施工的过程中因被雨水淋湿衣物而生病的情况出现,其次,通过气囊帘布的遮挡作用,能够有效的将雨水引导至基坑的两侧,减少基坑内出现积水的情况发生。
Civil construction foundation pit anti-sloughing supporting device and using method
一种土木施工基坑防塌支护装置及使用方法
ZHAO MUSHENG (author)
2023-03-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Civil construction foundation pit anti-sloughing supporting device
European Patent Office | 2023
|Civil construction foundation pit anti-sloughing supporting device and construction method thereof
European Patent Office | 2023
|Anti-sloughing supporting device for building foundation pit
European Patent Office | 2023
|Civil construction foundation pit anti-collapse supporting structure and construction method thereof
European Patent Office | 2024
|Construction improvement method for anti-sloughing grooving of water-rich soft geology
European Patent Office | 2023
|