A platform for research: civil engineering, architecture and urbanism
Fabricated steel module core tube structure and construction method
The invention discloses an assembly type steel module core tube structure which comprises a steel frame and a core tube fixedly connected into the steel frame, the steel frame is composed of a steel beam and a steel column, the section of the steel beam is of an I-shaped structure, the steel column is composed of a fixing strip and four rectangular column bodies, the section of the steel column is of a structure shaped like a Chinese character'tian ', and the rectangular column bodies are arranged in the fixing strip. Steel modules are connected into the steel columns in a sliding mode, the steel columns are arranged one by one in the vertical direction, every two vertically adjacent steel columns are connected through a connecting block, a plurality of steel beams are fixed to the side walls of the connecting blocks, four through holes are formed in the inner walls of the connecting blocks, and the connecting blocks are of a structure shaped like a Chinese character'tian 'from top to bottom. According to the fabricated steel module core tube structure, the bearing capacity is high, the advantages of high lateral resistance of a core tube frame system and high fabricated construction speed of a modular building are combined, and meanwhile the problems that the construction speed of a concrete core tube is low, the lateral resistance of the modular building is poor, and the whole building is not high are solved.
本发明公开了一种装配式钢模块核心筒结构,包括钢框架和固定连接在钢框架内部的核心筒,所述钢框架由钢梁和钢柱构成,所述钢梁的截面为工字型结构,所述钢柱由一个固定条和四个矩形柱体构成,所述钢柱的截面为田字型结构,所述钢柱内部滑动连接有钢模块,所述钢柱沿竖直方向逐个设置,且上下相邻的两个所述钢柱之间通过连接块连接,所述连接块侧壁固定有多个钢梁,所述连接块内壁开设有四个通孔,所述连接块自上而下看呈田字形结构。本发明中,装配式钢模块核心筒结构承载力高,结合核心筒框架体系抗侧能力强、模块化建筑装配施工速度快的优点,同时避免混凝土核心筒施工速度慢、模块化建筑抗侧能力差,整体建筑不高的问题。
Fabricated steel module core tube structure and construction method
The invention discloses an assembly type steel module core tube structure which comprises a steel frame and a core tube fixedly connected into the steel frame, the steel frame is composed of a steel beam and a steel column, the section of the steel beam is of an I-shaped structure, the steel column is composed of a fixing strip and four rectangular column bodies, the section of the steel column is of a structure shaped like a Chinese character'tian ', and the rectangular column bodies are arranged in the fixing strip. Steel modules are connected into the steel columns in a sliding mode, the steel columns are arranged one by one in the vertical direction, every two vertically adjacent steel columns are connected through a connecting block, a plurality of steel beams are fixed to the side walls of the connecting blocks, four through holes are formed in the inner walls of the connecting blocks, and the connecting blocks are of a structure shaped like a Chinese character'tian 'from top to bottom. According to the fabricated steel module core tube structure, the bearing capacity is high, the advantages of high lateral resistance of a core tube frame system and high fabricated construction speed of a modular building are combined, and meanwhile the problems that the construction speed of a concrete core tube is low, the lateral resistance of the modular building is poor, and the whole building is not high are solved.
本发明公开了一种装配式钢模块核心筒结构,包括钢框架和固定连接在钢框架内部的核心筒,所述钢框架由钢梁和钢柱构成,所述钢梁的截面为工字型结构,所述钢柱由一个固定条和四个矩形柱体构成,所述钢柱的截面为田字型结构,所述钢柱内部滑动连接有钢模块,所述钢柱沿竖直方向逐个设置,且上下相邻的两个所述钢柱之间通过连接块连接,所述连接块侧壁固定有多个钢梁,所述连接块内壁开设有四个通孔,所述连接块自上而下看呈田字形结构。本发明中,装配式钢模块核心筒结构承载力高,结合核心筒框架体系抗侧能力强、模块化建筑装配施工速度快的优点,同时避免混凝土核心筒施工速度慢、模块化建筑抗侧能力差,整体建筑不高的问题。
Fabricated steel module core tube structure and construction method
一种装配式钢模块核心筒结构及施工方法
WANG XIUJUN (author) / HUANG YUNCHANG (author) / MOU BEN (author) / AN QI (author) / CHEN KUN (author) / REN JIE (author) / DING HUI (author) / SHI XIAOLIANG (author)
2023-03-28
Patent
Electronic Resource
Chinese
Fabricated steel structure assembly and steel structure module for building construction
European Patent Office | 2024
|Fabricated tube well steel floor slab structure and construction method thereof
European Patent Office | 2024
|Construction method of core tube steel structure building for viewing
European Patent Office | 2023
|