A platform for research: civil engineering, architecture and urbanism
Fabricated double-steel-plate concrete composite wall
The invention discloses a fabricated double-steel-plate concrete composite wall which comprises a pair of symmetrically-arranged frame columns, the tops of the frame columns are connected with a frame beam through beam column joints, the lower portion of the frame beam is connected with a pair of side panels arranged front and back, and the bottoms of the frame columns are correspondingly connected with wall toe replaceable end columns. The wall toe replaceable end column is detachably connected with the frame column, the two side edges of the side panel are connected to the frame column, the frame column, the wall toe replaceable end column and the side panel define a pouring space of the concrete wall, and the frame column is connected with the beam column joint, the wall toe replaceable end column and the side panel through bolts. The material mechanical property advantages of steel and concrete are brought into full play, and the replaceable performance of damaged components is improved in combination with an assembly type technology.
本发明公开了一种装配式双钢板混凝土组合墙,包括对称设置的一对框架柱,框架柱顶部通过梁柱节点连接有框架梁,框架梁下方连接有一对前后设置的侧面板,框架柱底部对应连接有墙趾可更换端柱,墙趾可更换端柱与框架柱为可拆卸的连接,侧面板两侧边连接至框架柱,框架柱、墙趾可更换端柱以及侧面板围设形成混凝土墙体的灌注空间,框架柱与梁柱节点、墙趾可更换端柱、侧面板之间均通过螺栓连接。本发明充分发挥钢材和混凝土的材料力学性能优势,结合装配式技术,提高受损构件的可更换性能。
Fabricated double-steel-plate concrete composite wall
The invention discloses a fabricated double-steel-plate concrete composite wall which comprises a pair of symmetrically-arranged frame columns, the tops of the frame columns are connected with a frame beam through beam column joints, the lower portion of the frame beam is connected with a pair of side panels arranged front and back, and the bottoms of the frame columns are correspondingly connected with wall toe replaceable end columns. The wall toe replaceable end column is detachably connected with the frame column, the two side edges of the side panel are connected to the frame column, the frame column, the wall toe replaceable end column and the side panel define a pouring space of the concrete wall, and the frame column is connected with the beam column joint, the wall toe replaceable end column and the side panel through bolts. The material mechanical property advantages of steel and concrete are brought into full play, and the replaceable performance of damaged components is improved in combination with an assembly type technology.
本发明公开了一种装配式双钢板混凝土组合墙,包括对称设置的一对框架柱,框架柱顶部通过梁柱节点连接有框架梁,框架梁下方连接有一对前后设置的侧面板,框架柱底部对应连接有墙趾可更换端柱,墙趾可更换端柱与框架柱为可拆卸的连接,侧面板两侧边连接至框架柱,框架柱、墙趾可更换端柱以及侧面板围设形成混凝土墙体的灌注空间,框架柱与梁柱节点、墙趾可更换端柱、侧面板之间均通过螺栓连接。本发明充分发挥钢材和混凝土的材料力学性能优势,结合装配式技术,提高受损构件的可更换性能。
Fabricated double-steel-plate concrete composite wall
一种装配式双钢板混凝土组合墙
XU DAN (author) / XIANG BINGQUAN (author) / WANG JINGFENG (author) / WANG TAO (author) / KE ZHAIBANG (author) / YUE TENGSHENG (author) / WEI JIANPENG (author) / BAO YU (author) / JIAO ZHIAN (author) / CAI MENGYA (author)
2023-03-28
Patent
Electronic Resource
Chinese
Fabricated steel plate and concrete composite shear wall
European Patent Office | 2022
|Fabricated steel plate-dense rib concrete composite shear wall
European Patent Office | 2023
|Fabricated double-steel-pipe dense-rib concrete composite shear wall
European Patent Office | 2023
|