Bridge top plate concrete pouring and leveling construction method
The invention discloses a bridge top plate concrete pouring and leveling construction method. The method comprises the steps that firstly, a supporting truss is assembled; step 2, mounting a suspender and a leveling component; thirdly, the steel formworks and the rails are installed; 4, hoisting the supporting truss; 5, the leveling component is adjusted; and sixthly, concrete pouring is conducted. The method is simple in step and reasonable in design, the height and the transverse gradient of the leveling component are adjusted through the suspender, the design requirements for the concrete pouring height and the transverse gradient of the bridge top plate are met, manual measurement participation is reduced, and therefore the construction efficiency and the concrete pouring and leveling quality are improved.
本发明公开了一种桥梁顶板混凝土浇筑整平施工方法,包括步骤一、支撑桁架的拼装;步骤二、吊杆及整平部件的安装;步骤三、钢模板和轨道的安装;步骤四、支撑桁架的吊装;步骤五、整平部件的调节;步骤六、混凝土浇筑。本发明方法步骤简单,设计合理,通过吊杆实现平整部件高度及横向坡度调节,适应桥梁顶板混凝土浇筑高度及横向坡度设计要求,减少人工测量参与,从而提高了施工效率及混凝土浇筑整平质量。
Bridge top plate concrete pouring and leveling construction method
The invention discloses a bridge top plate concrete pouring and leveling construction method. The method comprises the steps that firstly, a supporting truss is assembled; step 2, mounting a suspender and a leveling component; thirdly, the steel formworks and the rails are installed; 4, hoisting the supporting truss; 5, the leveling component is adjusted; and sixthly, concrete pouring is conducted. The method is simple in step and reasonable in design, the height and the transverse gradient of the leveling component are adjusted through the suspender, the design requirements for the concrete pouring height and the transverse gradient of the bridge top plate are met, manual measurement participation is reduced, and therefore the construction efficiency and the concrete pouring and leveling quality are improved.
本发明公开了一种桥梁顶板混凝土浇筑整平施工方法,包括步骤一、支撑桁架的拼装;步骤二、吊杆及整平部件的安装;步骤三、钢模板和轨道的安装;步骤四、支撑桁架的吊装;步骤五、整平部件的调节;步骤六、混凝土浇筑。本发明方法步骤简单,设计合理,通过吊杆实现平整部件高度及横向坡度调节,适应桥梁顶板混凝土浇筑高度及横向坡度设计要求,减少人工测量参与,从而提高了施工效率及混凝土浇筑整平质量。
Bridge top plate concrete pouring and leveling construction method
一种桥梁顶板混凝土浇筑整平施工方法
DENG MEIBIN (author) / QIAO PENGHU (author) / SONG LEI (author) / DOU HAN (author) / LIANG LANJIANG (author) / SUN SHAOJUN (author) / SONG JIANG (author) / GU BIN (author) / AN LEYUAN (author) / AN BI (author)
2023-03-31
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Plate concrete laser measurement automatic pouring and leveling construction method
European Patent Office | 2023
|Portable bridge handrail concrete pouring and leveling device
European Patent Office | 2022
|