High-altitude roof large-span steel structure construction device and construction method
The invention discloses a construction method for a high-altitude roof large-span steel structure, and relates to the technical field of building construction.The high-altitude roof large-span steel structure comprises a construction working face, a profile steel platform and a small sliding tank, the profile steel platform is composed of two profile steel main beams and a plurality of profile steel connecting beams, and two profile steel stand columns are symmetrically arranged below each profile steel main beam; the structural steel connecting beams are evenly distributed between the two structural steel main beams, a color steel plate is further laid between the two structural steel main beams, the number of the small sliding tanks is four, and each small sliding tank is placed below one structural steel stand column. Compared with an existing construction method that the ultrahigh steel pipe full space operation frame is erected for bulk construction, the construction period is shortened, the construction cost is saved, and construction of other types of work on the lower floor is not affected.
本发明公开了一种高空屋面大跨度钢结构施工方法,涉及建筑施工技术领域,包括施工作业面、型钢平台和滑移小坦克,所述型钢平台由两条型钢主梁和若干条型钢连系梁构成,每条所述型钢主梁的下方均对称设有两个型钢立柱,若干条所述型钢连系梁均分布在两条型钢主梁之间,两条所述型钢主梁之间还铺设有彩钢板,所述滑移小坦克设有四个,每个所述滑移小坦克均放置在一个型钢立柱的下方;本发明相对现有搭设超高钢管满堂操作架进行散装的施工方法,加快了工期、节省了施工成本,且不影响下部楼层其他工种施工。
High-altitude roof large-span steel structure construction device and construction method
The invention discloses a construction method for a high-altitude roof large-span steel structure, and relates to the technical field of building construction.The high-altitude roof large-span steel structure comprises a construction working face, a profile steel platform and a small sliding tank, the profile steel platform is composed of two profile steel main beams and a plurality of profile steel connecting beams, and two profile steel stand columns are symmetrically arranged below each profile steel main beam; the structural steel connecting beams are evenly distributed between the two structural steel main beams, a color steel plate is further laid between the two structural steel main beams, the number of the small sliding tanks is four, and each small sliding tank is placed below one structural steel stand column. Compared with an existing construction method that the ultrahigh steel pipe full space operation frame is erected for bulk construction, the construction period is shortened, the construction cost is saved, and construction of other types of work on the lower floor is not affected.
本发明公开了一种高空屋面大跨度钢结构施工方法,涉及建筑施工技术领域,包括施工作业面、型钢平台和滑移小坦克,所述型钢平台由两条型钢主梁和若干条型钢连系梁构成,每条所述型钢主梁的下方均对称设有两个型钢立柱,若干条所述型钢连系梁均分布在两条型钢主梁之间,两条所述型钢主梁之间还铺设有彩钢板,所述滑移小坦克设有四个,每个所述滑移小坦克均放置在一个型钢立柱的下方;本发明相对现有搭设超高钢管满堂操作架进行散装的施工方法,加快了工期、节省了施工成本,且不影响下部楼层其他工种施工。
High-altitude roof large-span steel structure construction device and construction method
一种高空屋面大跨度钢结构施工装置及施工方法
CHEN PINGTAO (author) / HU JINHAI (author) / LIU CHEN (author) / HUANG QIN (author) / WANG XIAOBING (author) / XIE JIAN (author) / ZHOU CONG (author)
2023-03-31
Patent
Electronic Resource
Chinese
Large-span garbage pool roof high-altitude sliding construction method
European Patent Office | 2023
|Large-span steel structure roof reverse construction method
European Patent Office | 2023
|Construction method of large-span high-altitude steel structure
European Patent Office | 2020
|Large-span steel structure roof hoisting construction method
European Patent Office | 2023
|Large-span steel grid daylighting roof three-dimensional crawling high-altitude construction system
European Patent Office | 2024
|