A platform for research: civil engineering, architecture and urbanism
Pipe gallery comprehensive operation vehicle
The invention provides a comprehensive operation vehicle for a pipe gallery, relates to the technical field of underground pipe gallery prefabricated slab installation, and aims to solve the problems that the laying and installation efficiency of an existing prefabricated slab is low, firstly, a worker operates an auxiliary operation vehicle to place the prefabricated slab to be laid in a designated area, then the worker carries out secondary laying, and the whole construction period is prolonged. Comprising a vehicle frame, cabs are arranged on the two sides of the vehicle frame, the cabs have the driving control right, and brackets are symmetrically arranged on the vehicle frame. Compared with a conventional mode that prefabricated plates are conveyed firstly and then secondary paving is conducted by workers, the pipe gallery comprehensive operation vehicle integrates the transportation function and the plate paving function; the prefabricated slabs can be transported and laid only through one kind of equipment, the design of the double cabs is adopted, and the requirement for back-and-forth transportation in the tunnel construction environment where the prefabricated slabs cannot be turned around can be better met.
本发明提供一种管廊综合作业车,涉及地下管廊预制板安装技术领域,旨在解决现有预制板的铺设安装效率低,首先由工作人员操作辅助作业车将待铺设的预制板放置在指定区域后,再由工作人员进行二次铺设,整个施工周期延长的问题。包括车架,所述车架的两侧设置有驾驶室,所述驾驶室均具有驾驶控制权,所述车架上还对称设置有托架,相比常规先输送预制板再由工作人员进行二次铺装的方式,本发明的管廊综合作业车,集运输与铺板功能于一体,仅使用一种设备就能完成预制板的运输与铺设,采用双驾驶室设计,能更好的满足无法掉头的隧道施工环境中往返运输需求。
Pipe gallery comprehensive operation vehicle
The invention provides a comprehensive operation vehicle for a pipe gallery, relates to the technical field of underground pipe gallery prefabricated slab installation, and aims to solve the problems that the laying and installation efficiency of an existing prefabricated slab is low, firstly, a worker operates an auxiliary operation vehicle to place the prefabricated slab to be laid in a designated area, then the worker carries out secondary laying, and the whole construction period is prolonged. Comprising a vehicle frame, cabs are arranged on the two sides of the vehicle frame, the cabs have the driving control right, and brackets are symmetrically arranged on the vehicle frame. Compared with a conventional mode that prefabricated plates are conveyed firstly and then secondary paving is conducted by workers, the pipe gallery comprehensive operation vehicle integrates the transportation function and the plate paving function; the prefabricated slabs can be transported and laid only through one kind of equipment, the design of the double cabs is adopted, and the requirement for back-and-forth transportation in the tunnel construction environment where the prefabricated slabs cannot be turned around can be better met.
本发明提供一种管廊综合作业车,涉及地下管廊预制板安装技术领域,旨在解决现有预制板的铺设安装效率低,首先由工作人员操作辅助作业车将待铺设的预制板放置在指定区域后,再由工作人员进行二次铺设,整个施工周期延长的问题。包括车架,所述车架的两侧设置有驾驶室,所述驾驶室均具有驾驶控制权,所述车架上还对称设置有托架,相比常规先输送预制板再由工作人员进行二次铺装的方式,本发明的管廊综合作业车,集运输与铺板功能于一体,仅使用一种设备就能完成预制板的运输与铺设,采用双驾驶室设计,能更好的满足无法掉头的隧道施工环境中往返运输需求。
Pipe gallery comprehensive operation vehicle
一种管廊综合作业车
ZHANG YAQUN (author) / TANG WEIXIN (author) / YUAN AIJUAN (author) / WANG YUTING (author) / YUE YONGCHENG (author) / ZHANG YIZHONG (author) / LI XUEJIAN (author) / ZHANG JIANYING (author) / BIAN XINPING (author)
2023-04-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2021
|Comprehensive pipe gallery joint system and comprehensive pipe gallery
European Patent Office | 2021
|