A platform for research: civil engineering, architecture and urbanism
Prefabricated building concrete prefabricated part
The invention belongs to the technical field of fabricated buildings, particularly relates to a fabricated building concrete prefabricated part, and aims to solve the problem that concrete blocks on the surface of a wallboard and on the ground need to be cleaned subsequently due to the fact that grouting completion is judged according to concrete gushing-out in the prior art. A transfer column is arranged between every two hollow wallboards, a reinforcement cage is arranged in each hollow wallboard, concrete grout is poured on the two sides of each reinforcement cage, and a supporting frame is fixedly connected to the middle of the top end of each reinforcement cage. The bottom end of one hollow wallboard is in positioning butt joint with the top end of the other hollow wallboard, and when quantitative concrete grout subjected to scientific calculation is injected from the top end of the hollow wallboard, the concrete grout flows into the pouring main channel and the two pouring side channels from a butt joint opening and flows to the upper end of the hollow wallboard at the lower bottom end; and the joint of the two hollow wallboards is filled with concrete grout from bottom to top, so that the continuity and integrity of the joint are ensured.
本发明属于装配式建筑技术领域,尤其是一种装配式建筑混凝土预制构件,针对现有的依据混凝土涌出来判断注浆完成而导致墙板表面和地面需要后续清理混凝土块的问题,现提出以下方案,包括空心墙板,每两个所述空心墙板之间设置有转接柱,所述空心墙板内部设置有钢筋笼,且钢筋笼的两侧浇筑有混凝土浆液,钢筋笼顶端中间固定连接有支撑架。本发明中通过空心墙板底端与另一个空心墙板顶端定位对接,在经过科学计算后的定量的混凝土浆液从空心墙板顶端注入时,混凝土浆液从对接开口流入浇筑主通道和两个浇筑侧通道并向下底端的空心墙板的上端,进而使两个空心墙板的连接处从下而上的填充满混凝土浆液,确保了连接处的连贯性和完整性。
Prefabricated building concrete prefabricated part
The invention belongs to the technical field of fabricated buildings, particularly relates to a fabricated building concrete prefabricated part, and aims to solve the problem that concrete blocks on the surface of a wallboard and on the ground need to be cleaned subsequently due to the fact that grouting completion is judged according to concrete gushing-out in the prior art. A transfer column is arranged between every two hollow wallboards, a reinforcement cage is arranged in each hollow wallboard, concrete grout is poured on the two sides of each reinforcement cage, and a supporting frame is fixedly connected to the middle of the top end of each reinforcement cage. The bottom end of one hollow wallboard is in positioning butt joint with the top end of the other hollow wallboard, and when quantitative concrete grout subjected to scientific calculation is injected from the top end of the hollow wallboard, the concrete grout flows into the pouring main channel and the two pouring side channels from a butt joint opening and flows to the upper end of the hollow wallboard at the lower bottom end; and the joint of the two hollow wallboards is filled with concrete grout from bottom to top, so that the continuity and integrity of the joint are ensured.
本发明属于装配式建筑技术领域,尤其是一种装配式建筑混凝土预制构件,针对现有的依据混凝土涌出来判断注浆完成而导致墙板表面和地面需要后续清理混凝土块的问题,现提出以下方案,包括空心墙板,每两个所述空心墙板之间设置有转接柱,所述空心墙板内部设置有钢筋笼,且钢筋笼的两侧浇筑有混凝土浆液,钢筋笼顶端中间固定连接有支撑架。本发明中通过空心墙板底端与另一个空心墙板顶端定位对接,在经过科学计算后的定量的混凝土浆液从空心墙板顶端注入时,混凝土浆液从对接开口流入浇筑主通道和两个浇筑侧通道并向下底端的空心墙板的上端,进而使两个空心墙板的连接处从下而上的填充满混凝土浆液,确保了连接处的连贯性和完整性。
Prefabricated building concrete prefabricated part
一种装配式建筑混凝土预制构件
JIAO YIJIA (author)
2023-04-04
Patent
Electronic Resource
Chinese
Prefabricated building concrete prefabricated constructional column
European Patent Office | 2023
|European Patent Office | 2020
|Prefabricated part connecting assembly and concrete prefabricated part
European Patent Office | 2020
|