Rapid construction method of low-rise fabricated steel structure building
The invention relates to a low-rise assembly type steel structure building rapid construction method which comprises the following steps that 1, steel member prefabrication and ground arrangement are conducted, specifically, steel member prefabrication comprises steel structure-based BIM model splitting and prefabricated steel member machining; the ground arrangement comprises construction of a structure foundation of a proposed single body and installation of hoisting equipment; 2, the prefabricated steel members enter a site and are stacked; 3, the prefabricated steel member is grabbed through the hoisting equipment and moved to the installation position; and 4, the prefabricated steel members are connected and fixed. According to the construction method, deepening and component splitting are conducted on a steel structure, according to the stress and function requirements of hoisting equipment and proposed single bodies, the steel components are rapidly installed in a segmented mode, automatic positioning is combined, the construction mode is not limited to a traditional construction mode which circulates and is orderly from bottom to top, construction can be conducted in multiple floors at the same time, no vertical support exists on site, and the construction efficiency is improved. And the flexibility of on-site construction is greatly improved.
本发明涉及一种低层装配式钢结构建筑快速建造方法,包括如下步骤:步骤1:钢构件预制和地面布置,所述钢构件预制包括基于钢结构的BIM模型拆分并加工预制钢构件;所述地面布置包括施工拟建单体的结构基础以及安装吊运设备;步骤2:所述预制钢构件进场及堆放;步骤3:利用所述吊运设备抓取所述预制钢构件,并移动至安装位置;步骤4:所述预制钢构件连接固定。本发明通过对钢结构进行深化和构件拆分,根据吊运设备与拟建单体受力及功能需求,采用钢构件分段快速安装,结合自动定位,令建造方式不拘泥于传统的从下至上循环有序的建造方式,可在多楼层中同时进行施工,且现场无竖向支撑,现场施工的灵活度得到了大幅度提高。
Rapid construction method of low-rise fabricated steel structure building
The invention relates to a low-rise assembly type steel structure building rapid construction method which comprises the following steps that 1, steel member prefabrication and ground arrangement are conducted, specifically, steel member prefabrication comprises steel structure-based BIM model splitting and prefabricated steel member machining; the ground arrangement comprises construction of a structure foundation of a proposed single body and installation of hoisting equipment; 2, the prefabricated steel members enter a site and are stacked; 3, the prefabricated steel member is grabbed through the hoisting equipment and moved to the installation position; and 4, the prefabricated steel members are connected and fixed. According to the construction method, deepening and component splitting are conducted on a steel structure, according to the stress and function requirements of hoisting equipment and proposed single bodies, the steel components are rapidly installed in a segmented mode, automatic positioning is combined, the construction mode is not limited to a traditional construction mode which circulates and is orderly from bottom to top, construction can be conducted in multiple floors at the same time, no vertical support exists on site, and the construction efficiency is improved. And the flexibility of on-site construction is greatly improved.
本发明涉及一种低层装配式钢结构建筑快速建造方法,包括如下步骤:步骤1:钢构件预制和地面布置,所述钢构件预制包括基于钢结构的BIM模型拆分并加工预制钢构件;所述地面布置包括施工拟建单体的结构基础以及安装吊运设备;步骤2:所述预制钢构件进场及堆放;步骤3:利用所述吊运设备抓取所述预制钢构件,并移动至安装位置;步骤4:所述预制钢构件连接固定。本发明通过对钢结构进行深化和构件拆分,根据吊运设备与拟建单体受力及功能需求,采用钢构件分段快速安装,结合自动定位,令建造方式不拘泥于传统的从下至上循环有序的建造方式,可在多楼层中同时进行施工,且现场无竖向支撑,现场施工的灵活度得到了大幅度提高。
Rapid construction method of low-rise fabricated steel structure building
一种低层装配式钢结构建筑快速建造方法
PENG GUANGLEI (author) / LI TENG (author) / QIU CHANGQING (author)
2023-04-04
Patent
Electronic Resource
Chinese