A platform for research: civil engineering, architecture and urbanism
Greening method for explosion stacking slope of high and steep rock slope
The invention discloses a high and steep rock side slope explosion stacking slope greening method, and relates to the technical field of mine explosion. The high and steep rock side slope explosion stacking slope greening method comprises the steps that a plurality of blast holes are formed in a high and steep rock side slope of a mine ending side slope, and explosion devices are installed in the blast holes for explosion; the broken blocks after blasting are stacked at the slope toe with the broken blocks at the lower part with a certain gradient, and the upper section leans against the stable side slope after blasting until the broken blocks are kept in a natural and stable state; filling planting soil in gaps among the broken blocks on the blasted broken block pile, flushing water to bring the soil into the gaps of the broken blocks until the soil is flush with the surfaces of the broken blocks, and continuously covering the surfaces of the broken blocks with the planting soil; drought-enduring plant grass seeds are scattered on the planting soil for greening.
本发明公开了一种高陡岩体边坡爆堆放坡绿化方法,涉及矿山爆破技术领域。该高陡岩体边坡爆堆放坡绿化方法包括在矿山终了边坡的高陡岩体边坡上设置若干炮孔,在炮孔内安装爆破装置进行爆破;爆破后的碎块以一定的坡度下部的碎块堆叠在坡脚,上段靠在爆破后稳定的边坡上,直到碎块保持自然稳定的状态;在爆破后的碎块堆上,朝碎块之间的缝隙内填充种植土,同时进行冲水,把土带入碎块缝隙内,直到与碎块表面平,继续在其表面覆盖种植土;在种植土上撒上耐旱植物草籽绿化。
Greening method for explosion stacking slope of high and steep rock slope
The invention discloses a high and steep rock side slope explosion stacking slope greening method, and relates to the technical field of mine explosion. The high and steep rock side slope explosion stacking slope greening method comprises the steps that a plurality of blast holes are formed in a high and steep rock side slope of a mine ending side slope, and explosion devices are installed in the blast holes for explosion; the broken blocks after blasting are stacked at the slope toe with the broken blocks at the lower part with a certain gradient, and the upper section leans against the stable side slope after blasting until the broken blocks are kept in a natural and stable state; filling planting soil in gaps among the broken blocks on the blasted broken block pile, flushing water to bring the soil into the gaps of the broken blocks until the soil is flush with the surfaces of the broken blocks, and continuously covering the surfaces of the broken blocks with the planting soil; drought-enduring plant grass seeds are scattered on the planting soil for greening.
本发明公开了一种高陡岩体边坡爆堆放坡绿化方法,涉及矿山爆破技术领域。该高陡岩体边坡爆堆放坡绿化方法包括在矿山终了边坡的高陡岩体边坡上设置若干炮孔,在炮孔内安装爆破装置进行爆破;爆破后的碎块以一定的坡度下部的碎块堆叠在坡脚,上段靠在爆破后稳定的边坡上,直到碎块保持自然稳定的状态;在爆破后的碎块堆上,朝碎块之间的缝隙内填充种植土,同时进行冲水,把土带入碎块缝隙内,直到与碎块表面平,继续在其表面覆盖种植土;在种植土上撒上耐旱植物草籽绿化。
Greening method for explosion stacking slope of high and steep rock slope
一种高陡岩体边坡爆堆放坡绿化方法
HUANG QINGHE (author) / HUANG LONGHUA (author) / HUANG LEI (author)
2023-04-11
Patent
Electronic Resource
Chinese
High and steep rock slope greening structure for mine greening
European Patent Office | 2021
|Mine stable rock high and steep slope greening recovery method
European Patent Office | 2024
|High-temperature area steep wall rock slope landscape greening system
European Patent Office | 2024
|Integrated structure for ecological greening of high and steep rock slope
European Patent Office | 2021
|