The invention discloses a pyramid construction method which comprises the following steps: step (1), infrastructure construction; (2) building a bottom layer; (3) cofferdam construction; (4) building an upper layer; (5) extending the cofferdam; (6) building layer by layer; and step (7), cleaning the piled soil. The mode that soil is stacked around the outer portion of a pyramid layer by layer is adopted, meanwhile, carrying of building stones is achieved by combining the slope faces on the outer sides of the stacked soil, the problems of a traditional building mode and difficulty in high carrying of large materials are effectively solved, meanwhile, through implementation of the building mode, the building progress can be improved to a large extent, and the construction efficiency is improved. Although the defect that the workload is increased exists, the labor intensity of workers can be greatly reduced in the overall construction of the building, and the formed stacking mode can be matched according to the building progress to achieve effective pushing of the materials to be used at the building height.
本发明公开了一种金字塔的建造方法,包括以下步骤,步骤(1)、基础建设;步骤(2)、底层砌筑;步骤(3)、围堰;步骤(4)、上层砌筑;步骤(5)、围堰延伸;步骤(6)、逐层砌筑;步骤(7)、堆土清理。通过采用金字塔外部四周层层堆叠堆土的方式,同时结合以堆土外侧斜坡面实现建筑石料的搬运,有效解决传统建筑方式以及针对大型物料高度搬运的困难,同时通过该建造方式的实施,可较大程度上实现建造进度的提升,虽然存在着工作量增加的不足,但是其在建筑的整体施工中,确可以极大降低劳动者的劳动强度,形成的堆叠式方式,可根据建筑进度进行配合,实现待用物料的有效的建筑高度的推送。
The invention discloses a pyramid construction method which comprises the following steps: step (1), infrastructure construction; (2) building a bottom layer; (3) cofferdam construction; (4) building an upper layer; (5) extending the cofferdam; (6) building layer by layer; and step (7), cleaning the piled soil. The mode that soil is stacked around the outer portion of a pyramid layer by layer is adopted, meanwhile, carrying of building stones is achieved by combining the slope faces on the outer sides of the stacked soil, the problems of a traditional building mode and difficulty in high carrying of large materials are effectively solved, meanwhile, through implementation of the building mode, the building progress can be improved to a large extent, and the construction efficiency is improved. Although the defect that the workload is increased exists, the labor intensity of workers can be greatly reduced in the overall construction of the building, and the formed stacking mode can be matched according to the building progress to achieve effective pushing of the materials to be used at the building height.
本发明公开了一种金字塔的建造方法,包括以下步骤,步骤(1)、基础建设;步骤(2)、底层砌筑;步骤(3)、围堰;步骤(4)、上层砌筑;步骤(5)、围堰延伸;步骤(6)、逐层砌筑;步骤(7)、堆土清理。通过采用金字塔外部四周层层堆叠堆土的方式,同时结合以堆土外侧斜坡面实现建筑石料的搬运,有效解决传统建筑方式以及针对大型物料高度搬运的困难,同时通过该建造方式的实施,可较大程度上实现建造进度的提升,虽然存在着工作量增加的不足,但是其在建筑的整体施工中,确可以极大降低劳动者的劳动强度,形成的堆叠式方式,可根据建筑进度进行配合,实现待用物料的有效的建筑高度的推送。
Pyramid construction method
一种金字塔的建造方法
HU JIAN (author)
2023-04-11
Patent
Electronic Resource
Chinese
Construction of the Great Pyramid. The only plausible method
British Library Online Contents | 2002
|AFRIQUE - Construction of the Great Pyramid. The only plausible method
Online Contents | 2002
|Irregular multi-curve triangular pyramid welded ball net rack construction method
European Patent Office | 2024
|On the construction of the great pyramid at Giza
TIBKAT | 1995
|