A platform for research: civil engineering, architecture and urbanism
Construction membrane releasing device for geomembrane and construction method
The invention belongs to the technical field of geomembrane construction, and particularly relates to a geomembrane construction membrane releasing device and a construction method.The geomembrane construction membrane releasing device comprises a membrane body to be constructed and a walking driving vehicle used for pulling the membrane body to be unfolded, the membrane body is provided with a fixing device at a high slope of a construction site, and a jacking jack is hinged to the upper surface of a bottom plate of the walking driving vehicle; and a U-shaped mounting plate is further hinged to the upper surface of the bottom plate of the walking driving vehicle through a hinge seat, a traction tiling device is arranged on the surface of the mounting plate, and pressing devices are arranged on the two sides of the film body. According to the construction membrane releasing device for the geomembrane and the construction method, the end, provided with the clamping plate, of the membrane body is embedded into the rolled embedding groove and fixed through the fixing bolts, and the fixing bottom plate is fixed to the surface of a construction site through the fixing piles; and one side of the mounting lug plate is pulled and fixed through a pulling ring by virtue of a pulling steel rope which is fixedly mounted at an inclined angle, so that the effect of facilitating unwinding of the film body by the winding roller is realized.
本发明属于土工膜施工技术领域,尤其是一种用于土工膜的施工放膜装置以及施工方法,包括待施工的膜本体和用于牵拉膜本体展开的步履驱动车,膜本体在施工地的高坡处设置有固定装置,步履驱动车的底板上表面铰接有顶升千斤顶,步履驱动车的底板上表面还通过铰接座铰接有呈U型设置的安装板,安装板的表面设置有牵拉平铺装置,膜本体的两侧设置有压料装置。该用于土工膜的施工放膜装置以及施工方法,通过膜本体有夹板的一端嵌入收卷的嵌槽中,并通过固定螺栓将其固定,通过固定桩将固定底板固定在施工地的表面,并通过呈倾斜角度固定安装的牵拉钢绳将安装耳板的一侧通过牵拉环进行牵拉固定,进而实现利于收卷辊放卷膜本体的效果。
Construction membrane releasing device for geomembrane and construction method
The invention belongs to the technical field of geomembrane construction, and particularly relates to a geomembrane construction membrane releasing device and a construction method.The geomembrane construction membrane releasing device comprises a membrane body to be constructed and a walking driving vehicle used for pulling the membrane body to be unfolded, the membrane body is provided with a fixing device at a high slope of a construction site, and a jacking jack is hinged to the upper surface of a bottom plate of the walking driving vehicle; and a U-shaped mounting plate is further hinged to the upper surface of the bottom plate of the walking driving vehicle through a hinge seat, a traction tiling device is arranged on the surface of the mounting plate, and pressing devices are arranged on the two sides of the film body. According to the construction membrane releasing device for the geomembrane and the construction method, the end, provided with the clamping plate, of the membrane body is embedded into the rolled embedding groove and fixed through the fixing bolts, and the fixing bottom plate is fixed to the surface of a construction site through the fixing piles; and one side of the mounting lug plate is pulled and fixed through a pulling ring by virtue of a pulling steel rope which is fixedly mounted at an inclined angle, so that the effect of facilitating unwinding of the film body by the winding roller is realized.
本发明属于土工膜施工技术领域,尤其是一种用于土工膜的施工放膜装置以及施工方法,包括待施工的膜本体和用于牵拉膜本体展开的步履驱动车,膜本体在施工地的高坡处设置有固定装置,步履驱动车的底板上表面铰接有顶升千斤顶,步履驱动车的底板上表面还通过铰接座铰接有呈U型设置的安装板,安装板的表面设置有牵拉平铺装置,膜本体的两侧设置有压料装置。该用于土工膜的施工放膜装置以及施工方法,通过膜本体有夹板的一端嵌入收卷的嵌槽中,并通过固定螺栓将其固定,通过固定桩将固定底板固定在施工地的表面,并通过呈倾斜角度固定安装的牵拉钢绳将安装耳板的一侧通过牵拉环进行牵拉固定,进而实现利于收卷辊放卷膜本体的效果。
Construction membrane releasing device for geomembrane and construction method
一种用于土工膜的施工放膜装置以及施工方法
ZHANG BAOLI (author) / ZHANG QIANZHOU (author)
2023-04-14
Patent
Electronic Resource
Chinese
Bank protection geomembrane retracting and releasing equipment and construction method thereof
European Patent Office | 2022
|