A platform for research: civil engineering, architecture and urbanism
Method for conducting quadruple interchange defibering on railway through tunnel engineering
The invention discloses a method for conducting quadruple interchange defibering on a railway through tunnel engineering. The method comprises the steps that firstly, a passenger transport station A, a passenger transport station B, a passenger transport station C and a passenger transport station D are arranged in an urban built-up area; 2, an east-west direction high-speed rail channel A-A 'is arranged in the north of the city, an east-west direction high-speed rail channel B-B' is arranged in the middle of the city, a south-north direction high-speed rail channel C-C 'is arranged in the west of the city, and a northeast-southwest direction high-speed rail channel D-D' is arranged in the east of the city; thirdly, the high-speed rail channel B-B'and the high-speed rail channel C-C 'intersect in the mountain range on the west side of the city, and a first-layer interchange and a second-layer interchange are formed in the tunnel; a three-layer interchange is formed in the tunnel by arranging a defibered line E-E'from the high-speed rail channel B-B 'to the high-speed rail channel C-C', and a four-layer interchange is formed in the tunnel by arranging a defibered line F-F 'from the high-speed rail channel B-B' to the high-speed rail channel A-A. The requirement of convenient travel of passengers is met to the maximum extent, land use is greatly reduced, and city cutting caused by the defibered lines is reduced.
本发明公开了一种利用隧道工程对铁路进行四重立交疏解的方法,包括步骤一:在城市建成区布局客运站点A、站点B、站点C、站点D;步骤二:城市北部布设东西向高铁通道A‑A’,城市中部布设东西向高铁通道B‑B’,城市西部布设南北向高铁通道C‑C’,城市东部布设东北至西南向高铁通道D‑D’;步骤三:高铁通道B‑B’与高铁通道C‑C’于城市西侧的山脉中交叉,在隧道内形成一层、二层立交;设置高铁通道B‑B’至高铁通道C‑C’的疏解线E‑E’,在隧道内形成三层立交;设置高铁通道B‑B’至高铁通道A‑A’的疏解线F‑F’,在隧道内形成四层立交。该发明最大限度满足了旅客便捷出行的需求;也极大减少用地,减少了疏解线路对城市的切割。
Method for conducting quadruple interchange defibering on railway through tunnel engineering
The invention discloses a method for conducting quadruple interchange defibering on a railway through tunnel engineering. The method comprises the steps that firstly, a passenger transport station A, a passenger transport station B, a passenger transport station C and a passenger transport station D are arranged in an urban built-up area; 2, an east-west direction high-speed rail channel A-A 'is arranged in the north of the city, an east-west direction high-speed rail channel B-B' is arranged in the middle of the city, a south-north direction high-speed rail channel C-C 'is arranged in the west of the city, and a northeast-southwest direction high-speed rail channel D-D' is arranged in the east of the city; thirdly, the high-speed rail channel B-B'and the high-speed rail channel C-C 'intersect in the mountain range on the west side of the city, and a first-layer interchange and a second-layer interchange are formed in the tunnel; a three-layer interchange is formed in the tunnel by arranging a defibered line E-E'from the high-speed rail channel B-B 'to the high-speed rail channel C-C', and a four-layer interchange is formed in the tunnel by arranging a defibered line F-F 'from the high-speed rail channel B-B' to the high-speed rail channel A-A. The requirement of convenient travel of passengers is met to the maximum extent, land use is greatly reduced, and city cutting caused by the defibered lines is reduced.
本发明公开了一种利用隧道工程对铁路进行四重立交疏解的方法,包括步骤一:在城市建成区布局客运站点A、站点B、站点C、站点D;步骤二:城市北部布设东西向高铁通道A‑A’,城市中部布设东西向高铁通道B‑B’,城市西部布设南北向高铁通道C‑C’,城市东部布设东北至西南向高铁通道D‑D’;步骤三:高铁通道B‑B’与高铁通道C‑C’于城市西侧的山脉中交叉,在隧道内形成一层、二层立交;设置高铁通道B‑B’至高铁通道C‑C’的疏解线E‑E’,在隧道内形成三层立交;设置高铁通道B‑B’至高铁通道A‑A’的疏解线F‑F’,在隧道内形成四层立交。该发明最大限度满足了旅客便捷出行的需求;也极大减少用地,减少了疏解线路对城市的切割。
Method for conducting quadruple interchange defibering on railway through tunnel engineering
一种利用隧道工程对铁路进行四重立交疏解的方法
LI LONGYUN (author) / CAI SHENGQUAN (author) / YANG XUEZHONG (author) / ZHOU TANLONG (author) / ZHANG JIAFA (author) / PANG TAO (author) / LI CHUANYONG (author) / CHEN GANG (author) / ZHANG KUN (author) / LI LONG (author)
2023-04-14
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Alternative methodologies for sepiolite defibering
Online Contents | 2014
|Cross transportation track and transportation defibering system
European Patent Office | 2023
|Highway-railway interchange superstructure and engineering construction method
European Patent Office | 2022
|Special section - Railway Interchange Preview
Online Contents | 2013
Liberty Tunnel Interchange Pittsburgh
British Library Online Contents | 2002