Construction method for pile foundation in narrow space
The invention relates to the technical field of pile foundation construction, and discloses a narrow space pile foundation construction method which comprises the following steps: S1, cleaning a construction site; s2, determining a construction position; s3, pre-burying a steel casing; s4, preparing slurry and slurry equipment; s5, drilling construction is carried out; s6, hole cleaning construction is conducted; s7, steel reinforcement cage construction; s8, conducting pipe construction; s9, pouring concrete for construction; s10, excavating a pile head; the slurry equipment is arranged and replaces a traditional slurry pit, the traditional slurry pit needs to be constructed on site and is troublesome, the volume of the slurry pit is generally three to four times that of a pile hole, and therefore one slurry pit needs at least hundreds of square meters, and construction and construction are very inconvenient in a narrow space; the mud equipment can be used in a place far away from a narrow construction site, the occupied space is avoided, the mud equipment can be repeatedly used, and time is not wasted for building a mud pit any more.
本发明涉及桩基础施工技术领域,公开了狭窄空间的桩基础施工方法,包括以下步骤,S1、施工场地清理;S2、施工位置确定;S3、预埋钢护筒;S4、泥浆、泥浆设备制备;S5、钻孔施工;S6、清孔施工;S7、钢筋笼施工;S8、导管施工;S9、灌注混凝土施工;S10、开挖桩头;本发明通过设置有泥浆设备,泥浆设备代替了传统的泥浆池,传统的泥浆池需要现场施工建造,比较麻烦,并且泥浆池的容积一般为桩孔体积的三到四倍,因此一个泥浆池至少要上百平方米,在狭窄的空间里非常不方便施工建造,本发明的泥浆设备可以在离狭窄施工地点较远的地方使用,避免占用空间,并且可以多次重复使用,不再需要浪费时间建造泥浆池了。
Construction method for pile foundation in narrow space
The invention relates to the technical field of pile foundation construction, and discloses a narrow space pile foundation construction method which comprises the following steps: S1, cleaning a construction site; s2, determining a construction position; s3, pre-burying a steel casing; s4, preparing slurry and slurry equipment; s5, drilling construction is carried out; s6, hole cleaning construction is conducted; s7, steel reinforcement cage construction; s8, conducting pipe construction; s9, pouring concrete for construction; s10, excavating a pile head; the slurry equipment is arranged and replaces a traditional slurry pit, the traditional slurry pit needs to be constructed on site and is troublesome, the volume of the slurry pit is generally three to four times that of a pile hole, and therefore one slurry pit needs at least hundreds of square meters, and construction and construction are very inconvenient in a narrow space; the mud equipment can be used in a place far away from a narrow construction site, the occupied space is avoided, the mud equipment can be repeatedly used, and time is not wasted for building a mud pit any more.
本发明涉及桩基础施工技术领域,公开了狭窄空间的桩基础施工方法,包括以下步骤,S1、施工场地清理;S2、施工位置确定;S3、预埋钢护筒;S4、泥浆、泥浆设备制备;S5、钻孔施工;S6、清孔施工;S7、钢筋笼施工;S8、导管施工;S9、灌注混凝土施工;S10、开挖桩头;本发明通过设置有泥浆设备,泥浆设备代替了传统的泥浆池,传统的泥浆池需要现场施工建造,比较麻烦,并且泥浆池的容积一般为桩孔体积的三到四倍,因此一个泥浆池至少要上百平方米,在狭窄的空间里非常不方便施工建造,本发明的泥浆设备可以在离狭窄施工地点较远的地方使用,避免占用空间,并且可以多次重复使用,不再需要浪费时间建造泥浆池了。
Construction method for pile foundation in narrow space
狭窄空间的桩基础施工方法
LIU CHENGFEI (author) / ZHU HAOWEN (author) / FU XIANGJUE (author) / LIAN YANHUA (author) / LI RIFENG (author)
2023-04-14
Patent
Electronic Resource
Chinese
European Patent Office | 2015
|Pile foundation construction platform and pile foundation construction method
European Patent Office | 2020
|Pile foundation construction platform and pile foundation construction method
European Patent Office | 2023
|Pile foundation construction platform and pile foundation construction method
European Patent Office | 2024
|