Steel roof rigid prestress loading construction method
The invention discloses a steel roof rigid prestress loading construction method, and particularly relates to the technical field of building construction methods, which comprises the following steps: pre-construction reserve treatment, including establishment of a mounting position and auxiliary treatment; and a prestressed beam bottom supporting frame and a steel roof formwork are erected. According to the invention, through three-end measurement processing, data measurement can be carried out at three different angles of positive and negative visual angle measurement processing, left and right visual angle measurement processing and pitching visual angle measurement processing, and meanwhile, data measurement can be carried out through three different steps of preliminary measurement processing, confirmation measurement processing and re-check measurement processing, so that an accurate elongation value is obtained; according to the method, the technical problem that numerical values are lost due to the fact that the data scale of the measured values is small and the specific measured numerical value scale is small when the extension values are checked under the condition that a traditional measurement method is used for measurement is avoided as much as possible.
本发明公开了钢屋盖刚性预应力加载施工方法,具体涉及建筑施工方法技术领域,其包括如下步骤:预施工储备处理,包括确立安装位置及辅助处理;搭设预应力梁底部支撑架及钢屋盖模板。本发明通过三端测量处理,可于正反视角测量处理、左右侧视角测量处理与俯仰视角测量处理三个不同角度进行数据测量,同时还可以通过初步测量处理、确认测量处理和复核测量处理三个不同步骤进行数据测量,进而得出精确的伸长值,尽量地避免了在使用传统测量法进行测量的情况下,进行伸长值校核时,因其测量值的数据规模较小,且具体测量数值规模小,存在数值缺失的技术问题。
Steel roof rigid prestress loading construction method
The invention discloses a steel roof rigid prestress loading construction method, and particularly relates to the technical field of building construction methods, which comprises the following steps: pre-construction reserve treatment, including establishment of a mounting position and auxiliary treatment; and a prestressed beam bottom supporting frame and a steel roof formwork are erected. According to the invention, through three-end measurement processing, data measurement can be carried out at three different angles of positive and negative visual angle measurement processing, left and right visual angle measurement processing and pitching visual angle measurement processing, and meanwhile, data measurement can be carried out through three different steps of preliminary measurement processing, confirmation measurement processing and re-check measurement processing, so that an accurate elongation value is obtained; according to the method, the technical problem that numerical values are lost due to the fact that the data scale of the measured values is small and the specific measured numerical value scale is small when the extension values are checked under the condition that a traditional measurement method is used for measurement is avoided as much as possible.
本发明公开了钢屋盖刚性预应力加载施工方法,具体涉及建筑施工方法技术领域,其包括如下步骤:预施工储备处理,包括确立安装位置及辅助处理;搭设预应力梁底部支撑架及钢屋盖模板。本发明通过三端测量处理,可于正反视角测量处理、左右侧视角测量处理与俯仰视角测量处理三个不同角度进行数据测量,同时还可以通过初步测量处理、确认测量处理和复核测量处理三个不同步骤进行数据测量,进而得出精确的伸长值,尽量地避免了在使用传统测量法进行测量的情况下,进行伸长值校核时,因其测量值的数据规模较小,且具体测量数值规模小,存在数值缺失的技术问题。
Steel roof rigid prestress loading construction method
钢屋盖刚性预应力加载施工方法
WANG YAO (author) / LAI TINGGUI (author) / CHEN RONGJIAN (author) / SHI JIE (author) / WANG JINBIN (author) / ZHENG KEJUN (author) / YANG TINGJIE (author) / WU ZHIHONG (author) / HUO WENYING (author) / BAO MIN (author)
2023-04-14
Patent
Electronic Resource
Chinese
Large-span continuous rigid frame prestress construction method
European Patent Office | 2024
|Engineering Index Backfile | 1961
Rigid roof, building and construction method of rigid roof
European Patent Office | 2021
|