A platform for research: civil engineering, architecture and urbanism
Fabricated building wall connecting device and connecting method
The invention relates to the technical field of building construction devices, in particular to an assembly type building wall connecting device and a connecting method of the assembly type building wall connecting device. The positioning and guiding device further comprises a balance adjusting device installed at the lifting end of the movable lifting truck, a first expansion adjusting device is installed on one side of the balance adjusting device, and a second expansion adjusting device is installed on the side, away from the first expansion adjusting device, of the balance adjusting device. A guide clamping device is installed at the extending end of the first expansion adjusting device, a material pushing plate is installed at the extending end of the second expansion adjusting device, infrared emitters are arranged at the bottoms of the balance adjusting device, the guide clamping device and the material pushing plate, and a hole aligning detection device is further arranged below the balance adjusting device. The assembling efficiency is effectively ensured, and meanwhile manpower is saved.
本发明涉及建筑施工装置的技术领域,具体是涉及一种装配式建筑墙连接装置,具体还涉及一种装配式建筑墙连接装置的连接方法,包括安装在移动升降车上的定位引导装置,定位引导装置还包括安装在移动升降车升降端的平衡调节装置,平衡调节装置上的一侧均安装有第一扩张调节装置,平衡调节装置远离第一扩张调节装置的一侧安装有第二扩张调节装置,第一扩张调节装置的延伸端安装有引导夹持装置,第二扩张调节装置的延伸端安装有推料板,平衡调节装置、引导夹持装置和推料板的底部均设有红外线发射器,平衡调节装置的下方还设有对孔检测装置。本申请有效的确保装配效率,同时节省人力。
Fabricated building wall connecting device and connecting method
The invention relates to the technical field of building construction devices, in particular to an assembly type building wall connecting device and a connecting method of the assembly type building wall connecting device. The positioning and guiding device further comprises a balance adjusting device installed at the lifting end of the movable lifting truck, a first expansion adjusting device is installed on one side of the balance adjusting device, and a second expansion adjusting device is installed on the side, away from the first expansion adjusting device, of the balance adjusting device. A guide clamping device is installed at the extending end of the first expansion adjusting device, a material pushing plate is installed at the extending end of the second expansion adjusting device, infrared emitters are arranged at the bottoms of the balance adjusting device, the guide clamping device and the material pushing plate, and a hole aligning detection device is further arranged below the balance adjusting device. The assembling efficiency is effectively ensured, and meanwhile manpower is saved.
本发明涉及建筑施工装置的技术领域,具体是涉及一种装配式建筑墙连接装置,具体还涉及一种装配式建筑墙连接装置的连接方法,包括安装在移动升降车上的定位引导装置,定位引导装置还包括安装在移动升降车升降端的平衡调节装置,平衡调节装置上的一侧均安装有第一扩张调节装置,平衡调节装置远离第一扩张调节装置的一侧安装有第二扩张调节装置,第一扩张调节装置的延伸端安装有引导夹持装置,第二扩张调节装置的延伸端安装有推料板,平衡调节装置、引导夹持装置和推料板的底部均设有红外线发射器,平衡调节装置的下方还设有对孔检测装置。本申请有效的确保装配效率,同时节省人力。
Fabricated building wall connecting device and connecting method
一种装配式建筑墙连接装置及连接方法
CHEN HAIBO (author) / JIANG MINWEI (author) / HUANG AIHUA (author) / GU JUN (author)
2023-04-14
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste