Concrete ash silo upper structure and construction method thereof
The concrete ash silo upper structure comprises an ash silo fixed to the upper portion of an equipment operation flat layer, a top cover is arranged on the upper portion of the top of the ash silo, the periphery of the bottom of the ash silo is high, the middle of the ash silo is low, and an ash discharging pipeline is arranged in the middle of the ash silo and extends to an ash discharging opening so that the ash discharging pipeline can be received by a vehicle; according to the concrete ash silo upper structure and the construction method thereof, the construction time of an ash silo is greatly shortened, the purpose of saving the construction period is achieved, the construction efficiency and the construction quality of the ash silo are improved, the installation precision of equipment parts of an operation layer platform is effectively guaranteed, and interference between the parts and interference between the parts and an ash silo body are avoided.
本发明公开了一种混凝土灰库上部结构,包括固定在设备运转平层上部的灰库,灰库顶部上部设置顶盖,所述灰库底部四周高,中部低,在中部设置卸灰管道,卸灰管道延伸至卸灰口,使得被车所接收;本发明公开的混凝土灰库上部结构及其施工方法,灰库的施工时间大大缩短,达到了节约工期的目的,提高了灰库的施工效率和施工质量,有效保证了运转层平台设备零部件的安装精度,避免了部件与部件之间、部件与灰库仓体之间的干涉。
Concrete ash silo upper structure and construction method thereof
The concrete ash silo upper structure comprises an ash silo fixed to the upper portion of an equipment operation flat layer, a top cover is arranged on the upper portion of the top of the ash silo, the periphery of the bottom of the ash silo is high, the middle of the ash silo is low, and an ash discharging pipeline is arranged in the middle of the ash silo and extends to an ash discharging opening so that the ash discharging pipeline can be received by a vehicle; according to the concrete ash silo upper structure and the construction method thereof, the construction time of an ash silo is greatly shortened, the purpose of saving the construction period is achieved, the construction efficiency and the construction quality of the ash silo are improved, the installation precision of equipment parts of an operation layer platform is effectively guaranteed, and interference between the parts and interference between the parts and an ash silo body are avoided.
本发明公开了一种混凝土灰库上部结构,包括固定在设备运转平层上部的灰库,灰库顶部上部设置顶盖,所述灰库底部四周高,中部低,在中部设置卸灰管道,卸灰管道延伸至卸灰口,使得被车所接收;本发明公开的混凝土灰库上部结构及其施工方法,灰库的施工时间大大缩短,达到了节约工期的目的,提高了灰库的施工效率和施工质量,有效保证了运转层平台设备零部件的安装精度,避免了部件与部件之间、部件与灰库仓体之间的干涉。
Concrete ash silo upper structure and construction method thereof
一种混凝土灰库上部结构及其施工方法
MA AIXIA (author) / CAO LING (author) / SHI JIANGUANG (author) / MA QIAN (author) / ZHOU CHAOHUI (author) / LIU YONGFENG (author) / SHI CHANGWEI (author) / ZHANG JIUCHANG (author) / CHENG WENGUANG (author) / XIAO YONGJIE (author)
2023-04-21
Patent
Electronic Resource
Chinese
Concrete storage silo funnel structure and construction method thereof
European Patent Office | 2023
|Construction of reinforced concrete silo
Engineering Index Backfile | 1965
|Rapid reinforced concrete silo construction
Engineering Index Backfile | 1933
European Patent Office | 2020
|Hoop assembly type concrete round silo and construction method thereof
European Patent Office | 2023
|