A platform for research: civil engineering, architecture and urbanism
Construction method of road engineering
The invention discloses a construction method of road engineering. The construction method comprises the following steps: S1, leveling and tamping a site; s2, cleaning the ground; s3, snapping lines, dividing grids, positioning and erecting a mold; s4, dotting; s5, remeasuring by the level gauge; s6, watering for wetting; s7, brushing plain cement mortar; s8, fine aggregate concrete is poured, and the fine aggregate concrete is fully vibrated and scraped to be flat; s9, carrying out slurry extraction, and scattering graded gravel; s10, carrying out light receiving treatment; s11, joint cutting is carried out; s12, maintenance is conducted; s13, protecting a finished product; s14, finely grinding the ground; s15, spraying a sealing curing agent; and S16, washing the ground. According to the road constructed through the construction method, the effects of improving the anti-pollution performance, the flatness and the attractiveness are achieved.
本发明公开了一种道路工程的施工方法,包括如下步骤:S1、场地找平夯实;S2、清理地面;S3、弹线,分格,定位,立模;S4、打点;S5、水准仪复测;S6、洒水湿润;S7、刷素水泥砂浆;S8、浇筑细石混凝土,细石混凝土充分振捣且刮平;S9、提浆,撒级配砂石;S10、收光处理;S11、切缝;S12、养护;S13、成品保护;S14、精细研磨地面;S15、喷洒密封固化剂;S16、冲洗地面。采用本发明施工方法完成的道路实现了提高了抗污性能、平整度以及美观的效果。
Construction method of road engineering
The invention discloses a construction method of road engineering. The construction method comprises the following steps: S1, leveling and tamping a site; s2, cleaning the ground; s3, snapping lines, dividing grids, positioning and erecting a mold; s4, dotting; s5, remeasuring by the level gauge; s6, watering for wetting; s7, brushing plain cement mortar; s8, fine aggregate concrete is poured, and the fine aggregate concrete is fully vibrated and scraped to be flat; s9, carrying out slurry extraction, and scattering graded gravel; s10, carrying out light receiving treatment; s11, joint cutting is carried out; s12, maintenance is conducted; s13, protecting a finished product; s14, finely grinding the ground; s15, spraying a sealing curing agent; and S16, washing the ground. According to the road constructed through the construction method, the effects of improving the anti-pollution performance, the flatness and the attractiveness are achieved.
本发明公开了一种道路工程的施工方法,包括如下步骤:S1、场地找平夯实;S2、清理地面;S3、弹线,分格,定位,立模;S4、打点;S5、水准仪复测;S6、洒水湿润;S7、刷素水泥砂浆;S8、浇筑细石混凝土,细石混凝土充分振捣且刮平;S9、提浆,撒级配砂石;S10、收光处理;S11、切缝;S12、养护;S13、成品保护;S14、精细研磨地面;S15、喷洒密封固化剂;S16、冲洗地面。采用本发明施工方法完成的道路实现了提高了抗污性能、平整度以及美观的效果。
Construction method of road engineering
一种道路工程的施工方法
HUANG WENDONG (author) / CHEN HONGJIE (author) / WANG CHIXIANG (author) / FENG GUANGNAN (author) / LIM CHANG-WON (author) / ZHOU YI (author) / ZHU XUANXI (author) / DONG CHENLU (author) / LI BINGMIN (author) / CHEN SHENG (author)
2023-04-25
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Road engineering pavement construction device and construction method
European Patent Office | 2024
|