A platform for research: civil engineering, architecture and urbanism
Prefabricated small box girder cast-in-place joint aerial work platform
The invention relates to a prefabricated small box girder cast-in-place joint aerial work platform which comprises a round hoisting hole, square blocking frames, square foot blocking plates, a hanging basket bottom plate, square steel pipe supports and vertical rod belt adjustable brackets. The square blocking frames are welded to the two sides of the hanging basket bottom plate, the square foot blocking plates are welded to the hanging basket bottom plate, and the square steel pipe supports are welded to the upper ends of the square blocking frames. A circular hoisting hole is formed in the upper end of the middle vertical rod, and vertical rod belt adjustable brackets are welded to the four corners of the bottom of the hanging basket bottom plate respectively. The high-altitude operation platform is flexible and convenient to enter and exit from the blocking opening, construction operation of workers is facilitated, and entering and exiting are safe. The horizontal angle of the hanging basket is adjusted according to the box girder cantilever end, and the construction balance state is guaranteed; the adjustable brackets are arranged on the two sides of the platform, the hanging basket can be effectively fixed, balance of the hanging basket can be controlled, it is guaranteed that workers can smoothly move in the construction process, and the operation efficiency is improved.
本发明涉及一种预制小箱梁现浇接缝高空作业平台,包括:圆形吊装孔、方形挡架、方形挡脚板、挂篮底板、方形钢管支架、立杆带可调托座,挂篮底板两侧焊接连接方形挡架,挂篮底板上面焊接有方形挡脚板,方形挡架上端焊接方形钢管支架,中间竖杆上端设有圆形吊装孔,挂篮底板底部四角上分别焊接有立杆带可调托座。本发明的高空作业平台出入档口灵活、便捷,有利于工人施工操作、进出安全。同时根据箱梁悬臂端调节挂篮水平角度,保障施工平衡状态;平台两边采用可调托座,能够有效地固定住挂篮,控制其平衡,保障工人在施工过程中能够流畅的移动,提高作业效率。
Prefabricated small box girder cast-in-place joint aerial work platform
The invention relates to a prefabricated small box girder cast-in-place joint aerial work platform which comprises a round hoisting hole, square blocking frames, square foot blocking plates, a hanging basket bottom plate, square steel pipe supports and vertical rod belt adjustable brackets. The square blocking frames are welded to the two sides of the hanging basket bottom plate, the square foot blocking plates are welded to the hanging basket bottom plate, and the square steel pipe supports are welded to the upper ends of the square blocking frames. A circular hoisting hole is formed in the upper end of the middle vertical rod, and vertical rod belt adjustable brackets are welded to the four corners of the bottom of the hanging basket bottom plate respectively. The high-altitude operation platform is flexible and convenient to enter and exit from the blocking opening, construction operation of workers is facilitated, and entering and exiting are safe. The horizontal angle of the hanging basket is adjusted according to the box girder cantilever end, and the construction balance state is guaranteed; the adjustable brackets are arranged on the two sides of the platform, the hanging basket can be effectively fixed, balance of the hanging basket can be controlled, it is guaranteed that workers can smoothly move in the construction process, and the operation efficiency is improved.
本发明涉及一种预制小箱梁现浇接缝高空作业平台,包括:圆形吊装孔、方形挡架、方形挡脚板、挂篮底板、方形钢管支架、立杆带可调托座,挂篮底板两侧焊接连接方形挡架,挂篮底板上面焊接有方形挡脚板,方形挡架上端焊接方形钢管支架,中间竖杆上端设有圆形吊装孔,挂篮底板底部四角上分别焊接有立杆带可调托座。本发明的高空作业平台出入档口灵活、便捷,有利于工人施工操作、进出安全。同时根据箱梁悬臂端调节挂篮水平角度,保障施工平衡状态;平台两边采用可调托座,能够有效地固定住挂篮,控制其平衡,保障工人在施工过程中能够流畅的移动,提高作业效率。
Prefabricated small box girder cast-in-place joint aerial work platform
预制小箱梁现浇接缝高空作业平台
ZHAO GUOWEI (author) / WU RONGHUA (author) / LI XUEXU (author) / ZHU YICHENG (author) / WANG XIANG (author) / YAN YUSHUO (author) / KONG XIANGTAO (author)
2023-04-28
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2023
|Prefabricated column cast-in-place connecting joint formwork
European Patent Office | 2020
|Prefabricated small box girder bridge wet joint overlapping construction method
European Patent Office | 2023
|European Patent Office | 2024
|