Construction method for inverted filter of retaining wall
The invention relates to the technical field of civil construction, in particular to a retaining wall inverted filter construction method which comprises the following steps: excavating the position of a retaining wall, erecting a formwork on one side during earth excavation, and adopting a soil formwork on the other side; pouring a retaining wall foundation or a cushion layer, and pre-burying reinforcing steel bars before pouring; the embedded steel bars and the split bolts are welded, and the formwork is tied; cutting an inclined surface at the end of one side of the water drain pipe, and forming holes in the periphery of the pipe end of the side; steel wire balls and graded broken stones are loaded into the pipe end on the cut side, the steel wire balls are arranged on the inner side, and the graded broken stones are arranged on the outer side; two vertical limiting steel bars are inserted into one side, far away from the graded broken stones, of the water drain pipe corresponding to the steel wire ball; inserting the cut end of the water drain pipe into soil; and normal concrete pouring is performed. According to the invention, the construction process is simplified, the workload of earth excavation and backfilling is reduced, the use amount of broken stones is also reduced, and the construction cost is also reduced while the construction period is accelerated.
本发明涉及土木建筑技术领域,尤其是一种挡土墙反滤层施工方法,对挡土墙位置开挖,土方开挖时单侧支模,另一侧采用土模;进行挡土墙基础或垫层浇筑,浇筑前预埋钢筋;将预埋钢筋和对拉螺栓焊接做好模板拉结;将泄水管的一侧端头切割斜面,并在该侧管端四周进行开孔;将切割一侧管端装入钢丝团及级配碎石,钢丝团至于内侧,级配碎石至于外侧;泄水管对应钢丝团远离级配碎石一侧插入两根相互垂直的限位钢筋;将泄水管切割的一端插入土中;正常混凝土浇筑即可。本发明简化了施工工序,减少了土方开挖和回填的工作量,也减少了碎石用量,加快了施工工期的同时还降低了施工成本。
Construction method for inverted filter of retaining wall
The invention relates to the technical field of civil construction, in particular to a retaining wall inverted filter construction method which comprises the following steps: excavating the position of a retaining wall, erecting a formwork on one side during earth excavation, and adopting a soil formwork on the other side; pouring a retaining wall foundation or a cushion layer, and pre-burying reinforcing steel bars before pouring; the embedded steel bars and the split bolts are welded, and the formwork is tied; cutting an inclined surface at the end of one side of the water drain pipe, and forming holes in the periphery of the pipe end of the side; steel wire balls and graded broken stones are loaded into the pipe end on the cut side, the steel wire balls are arranged on the inner side, and the graded broken stones are arranged on the outer side; two vertical limiting steel bars are inserted into one side, far away from the graded broken stones, of the water drain pipe corresponding to the steel wire ball; inserting the cut end of the water drain pipe into soil; and normal concrete pouring is performed. According to the invention, the construction process is simplified, the workload of earth excavation and backfilling is reduced, the use amount of broken stones is also reduced, and the construction cost is also reduced while the construction period is accelerated.
本发明涉及土木建筑技术领域,尤其是一种挡土墙反滤层施工方法,对挡土墙位置开挖,土方开挖时单侧支模,另一侧采用土模;进行挡土墙基础或垫层浇筑,浇筑前预埋钢筋;将预埋钢筋和对拉螺栓焊接做好模板拉结;将泄水管的一侧端头切割斜面,并在该侧管端四周进行开孔;将切割一侧管端装入钢丝团及级配碎石,钢丝团至于内侧,级配碎石至于外侧;泄水管对应钢丝团远离级配碎石一侧插入两根相互垂直的限位钢筋;将泄水管切割的一端插入土中;正常混凝土浇筑即可。本发明简化了施工工序,减少了土方开挖和回填的工作量,也减少了碎石用量,加快了施工工期的同时还降低了施工成本。
Construction method for inverted filter of retaining wall
挡土墙反滤层施工方法
LIANG YICHENG (author) / WANG ZHIJUN (author) / WU HAIBIN (author) / LI YANG (author) / LIU XIN (author) / LI ZHIXIAN (author) / JIAO JIARUI (author) / CHEN ZHEN (author)
2023-04-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Retaining wall fabricated inverted filter bag construction method
European Patent Office | 2021
|Construction method for inverted filter of retaining wall
European Patent Office | 2024
|Prefabricated inverted filter retaining wall and construction method thereof
European Patent Office | 2024
|Construction method of retaining wall graded broken stone inverted filter
European Patent Office | 2024
|Retaining wall assembly type inverted filter structure and construction method thereof
European Patent Office | 2024
|