A platform for research: civil engineering, architecture and urbanism
Prefabricated column connecting structure and construction method thereof
The invention discloses a prefabricated column connecting structure and a construction method thereof, and relates to the technical field of prefabricated columns, the prefabricated column connecting structure comprises a first prefabricated column, a connecting assembly and a second prefabricated column; a plurality of first linear steel bars are embedded in the first prefabricated column; a plurality of second linear steel bars are embedded in the second prefabricated column; the connecting assembly comprises a first component, a second component and a third component. A stepped hole is formed in the first component, and the small-diameter end of the stepped hole is in threaded connection with the end of the first linear steel bar or the end of the second linear steel bar. A semi-arc surface is arranged at the large-diameter end of the first component; the second component is arranged in the large-diameter end of the first component; the third component is mounted on the outer sides of the two semi-arc surfaces; the second component is solid and hollow; the solid second component can achieve pure mechanical connection of the first prefabricated column and the second prefabricated column, the installation speed is high, enough supporting strength is provided for the first prefabricated column, and extra temporary supporting is not needed; and concrete is poured in the hollow second component, so that the connection integrity is improved.
本发明公开了一种预制柱连接结构及其施工方法,涉及预制柱技术领域,包括第一预制柱、连接组件、第二预制柱;第一预制柱内嵌有多个第一直线钢筋;第二预制柱内嵌有多个第二直线钢筋;连接组件包括第一构件、第二构件、第三构件;第一构件内设有阶梯孔,该阶梯孔的小径端螺纹连接在第一直线钢筋或者第二直线钢筋的端部;第一构件的大径端设有半弧面;第二构件置于第一构件的大径端内;第三构件安装在两个半弧面的外侧;第二构件有实心的,也有空心的;实心的第二构件,能够实现对第一预制柱和第二预制柱的纯机械连接,安装速度块且对第一预制柱有足够的支撑强度,不需要额外的临时支撑;在空心的第二构件内浇筑混凝土,从而提高连接的整体性。
Prefabricated column connecting structure and construction method thereof
The invention discloses a prefabricated column connecting structure and a construction method thereof, and relates to the technical field of prefabricated columns, the prefabricated column connecting structure comprises a first prefabricated column, a connecting assembly and a second prefabricated column; a plurality of first linear steel bars are embedded in the first prefabricated column; a plurality of second linear steel bars are embedded in the second prefabricated column; the connecting assembly comprises a first component, a second component and a third component. A stepped hole is formed in the first component, and the small-diameter end of the stepped hole is in threaded connection with the end of the first linear steel bar or the end of the second linear steel bar. A semi-arc surface is arranged at the large-diameter end of the first component; the second component is arranged in the large-diameter end of the first component; the third component is mounted on the outer sides of the two semi-arc surfaces; the second component is solid and hollow; the solid second component can achieve pure mechanical connection of the first prefabricated column and the second prefabricated column, the installation speed is high, enough supporting strength is provided for the first prefabricated column, and extra temporary supporting is not needed; and concrete is poured in the hollow second component, so that the connection integrity is improved.
本发明公开了一种预制柱连接结构及其施工方法,涉及预制柱技术领域,包括第一预制柱、连接组件、第二预制柱;第一预制柱内嵌有多个第一直线钢筋;第二预制柱内嵌有多个第二直线钢筋;连接组件包括第一构件、第二构件、第三构件;第一构件内设有阶梯孔,该阶梯孔的小径端螺纹连接在第一直线钢筋或者第二直线钢筋的端部;第一构件的大径端设有半弧面;第二构件置于第一构件的大径端内;第三构件安装在两个半弧面的外侧;第二构件有实心的,也有空心的;实心的第二构件,能够实现对第一预制柱和第二预制柱的纯机械连接,安装速度块且对第一预制柱有足够的支撑强度,不需要额外的临时支撑;在空心的第二构件内浇筑混凝土,从而提高连接的整体性。
Prefabricated column connecting structure and construction method thereof
一种预制柱连接结构及其施工方法
YANG XIN (author) / LIU GAOJIE (author) / GE YONGFEI (author) / ZHU YU (author) / MAO XIAOFEI (author) / JIA YAKE (author) / LIAO XINGJIANG (author) / WANG SHUN (author)
2023-05-02
Patent
Electronic Resource
Chinese
Prefabricated column connecting structure and construction method thereof
European Patent Office | 2023
|Assembly type prefabricated column connecting structure and construction method thereof
European Patent Office | 2024
|Assembly type prefabricated column connecting structure and construction method thereof
European Patent Office | 2024
|Connecting structure for prefabricated beam column and construction method thereof
European Patent Office | 2020
|Prefabricated concrete beam-column connecting structure and construction method thereof
European Patent Office | 2021
|