A platform for research: civil engineering, architecture and urbanism
Fabricated building wall structure and construction method
The invention discloses a fabricated building wall structure and a construction method, and relates to the field of fabricated building walls. The device comprises a first wall body, a second wall body is connected to the first wall body, the first wall body and the second wall body form a structure comprising a first wall plate, a second wall plate and a steel bar frame, and the first wall body and the second wall body need a connecting mechanism for auxiliary construction in the connecting process. According to the fabricated building wall body structure and the construction method, the connecting columns are arranged on the side faces of the wall bodies after pouring, and then the second connecting blocks arranged at the connecting columns on one side of the second wall body are inserted into the first connecting blocks arranged at the connecting columns on one side of the first wall body; and then an inserting block arranged at the second connecting block is inserted into an inserting groove formed in one side of the first connecting block, so that the two sets of connecting blocks are connected, the connecting columns arranged on one sides of the two sets of wall bodies are subjected to assembly type positioning connection, and position deviation in the wall body assembly process is avoided.
本发明公开一种装配式建筑墙体结构及施工方法,涉及装配式建筑墙体领域。该装置包括第一墙体,第一墙体处连接设置有第二墙体,第一墙体和第二墙体组成结构包括第一墙板、第二墙板和钢筋架,第一墙体和第二墙体在连接过程中需要连接机构进行辅助施工。该一种装配式建筑墙体结构及施工方法,通过在浇筑后墙体侧面设置连接柱,然后将第二墙体一侧连接柱处设置的第二连接块插接在第一墙体一侧连接柱处设置的第一连接块处,接着将第二连接块处设置的插块插接在第一连接块一侧开设的插槽中,使得两组连接块之间进行连接,以便对两组墙体一侧设置的连接柱进行装配式定位连接,避免墙体装配过程中出现位置偏差。
Fabricated building wall structure and construction method
The invention discloses a fabricated building wall structure and a construction method, and relates to the field of fabricated building walls. The device comprises a first wall body, a second wall body is connected to the first wall body, the first wall body and the second wall body form a structure comprising a first wall plate, a second wall plate and a steel bar frame, and the first wall body and the second wall body need a connecting mechanism for auxiliary construction in the connecting process. According to the fabricated building wall body structure and the construction method, the connecting columns are arranged on the side faces of the wall bodies after pouring, and then the second connecting blocks arranged at the connecting columns on one side of the second wall body are inserted into the first connecting blocks arranged at the connecting columns on one side of the first wall body; and then an inserting block arranged at the second connecting block is inserted into an inserting groove formed in one side of the first connecting block, so that the two sets of connecting blocks are connected, the connecting columns arranged on one sides of the two sets of wall bodies are subjected to assembly type positioning connection, and position deviation in the wall body assembly process is avoided.
本发明公开一种装配式建筑墙体结构及施工方法,涉及装配式建筑墙体领域。该装置包括第一墙体,第一墙体处连接设置有第二墙体,第一墙体和第二墙体组成结构包括第一墙板、第二墙板和钢筋架,第一墙体和第二墙体在连接过程中需要连接机构进行辅助施工。该一种装配式建筑墙体结构及施工方法,通过在浇筑后墙体侧面设置连接柱,然后将第二墙体一侧连接柱处设置的第二连接块插接在第一墙体一侧连接柱处设置的第一连接块处,接着将第二连接块处设置的插块插接在第一连接块一侧开设的插槽中,使得两组连接块之间进行连接,以便对两组墙体一侧设置的连接柱进行装配式定位连接,避免墙体装配过程中出现位置偏差。
Fabricated building wall structure and construction method
一种装配式建筑墙体结构及施工方法
TU SHUQIANG (author)
2023-05-02
Patent
Electronic Resource
Chinese
Fabricated building wall construction structure and construction method
European Patent Office | 2024
|Fabricated building outer wall structure construction method
European Patent Office | 2024
|Fabricated building wall surface structure and construction method
European Patent Office | 2023
|Fabricated green building wall structure and construction method
European Patent Office | 2024
|