A platform for research: civil engineering, architecture and urbanism
A construction site material storage system based on Internet of Things big data relates to the technical field of Internet of Things management and comprises a fixing frame, a feeding device, a first workbench and a second workbench, the fixing frame is provided with the feeding device, the first workbench and the second workbench, and the feeding device is composed of a first fixing device, a second fixing device, a third fixing device and a connecting line. The first fixing device, the second fixing device and the third fixing device are connected through connecting wires, the first fixing device and the second fixing device are connected with the fixing frame, and the third fixing device is connected with the first workbench; the scaffold accessory conveying device is reasonable and practical in structure and easy to operate, a worker on the ground can conveniently convey substances on the ground to a high-altitude workbench, time and labor are saved, and meanwhile scaffold accessories are convenient to manage.
一种物联网大数据建筑工地材料保管系统,涉及物联网管理技术领域,包括固定架、上料装置、第一工作台和第二工作台,固定架上设有上料装置、第一工作台和第二工作台,上料装置由第一固定装置、第二固定装置、第三固定装置和连接线构成,第一固定装置、第二固定装置和第三固定装置通过连接线相连接,第一固定装置和第二固定装置与固定架相连接,第三固定装置与第一工作台相连接;本发明结构合理实用,操作简单,不仅便于地面的工作人员把地面的物质送到高空的工作台上,而且省时省力,同时也便于管理脚手架配件。
A construction site material storage system based on Internet of Things big data relates to the technical field of Internet of Things management and comprises a fixing frame, a feeding device, a first workbench and a second workbench, the fixing frame is provided with the feeding device, the first workbench and the second workbench, and the feeding device is composed of a first fixing device, a second fixing device, a third fixing device and a connecting line. The first fixing device, the second fixing device and the third fixing device are connected through connecting wires, the first fixing device and the second fixing device are connected with the fixing frame, and the third fixing device is connected with the first workbench; the scaffold accessory conveying device is reasonable and practical in structure and easy to operate, a worker on the ground can conveniently convey substances on the ground to a high-altitude workbench, time and labor are saved, and meanwhile scaffold accessories are convenient to manage.
一种物联网大数据建筑工地材料保管系统,涉及物联网管理技术领域,包括固定架、上料装置、第一工作台和第二工作台,固定架上设有上料装置、第一工作台和第二工作台,上料装置由第一固定装置、第二固定装置、第三固定装置和连接线构成,第一固定装置、第二固定装置和第三固定装置通过连接线相连接,第一固定装置和第二固定装置与固定架相连接,第三固定装置与第一工作台相连接;本发明结构合理实用,操作简单,不仅便于地面的工作人员把地面的物质送到高空的工作台上,而且省时省力,同时也便于管理脚手架配件。
Internet of Things big data construction site material storage system
一种物联网大数据建筑工地材料保管系统
TIAN JIAO (author)
2023-05-02
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
Intelligent construction site steel bar material distribution method based on Internet of Things
European Patent Office | 2021
|European Patent Office | 2023
|Intelligent construction site dust falling device based on Internet of Things
European Patent Office | 2024
|Internet-of-things monitoring system for indoor construction
European Patent Office | 2021
|Dust falling device for intelligent construction site based on Internet of Things technology
European Patent Office | 2020
|