Ocean engineering ship
The invention discloses an ocean engineering ship which comprises a ship body provided with a deck; the deck is used for storing pile foundations; the maritime work crane is arranged on the deck; the maritime work crane is used for pile foundation construction; the inverted barge crane is arranged on the deck; the pile foundation storage area is used for inversely barging a pile foundation on a pile transporting ship to the pile foundation storage area of the deck; and when the pile transporting ship cannot supply in time, pile foundation construction is conducted through the pile foundations on the deck. The deck area of the ship body can be enlarged, so that a deck can store a certain amount of pile foundations. Therefore, even if the pile transporting ship cannot supply the pile in time in the offshore operation window period, constructors can carry out pile foundation construction through the pile foundation on the deck, the offshore operation window period can be fully utilized, the continuity of pile foundation construction of a ship machine is guaranteed, and the operation efficiency is improved.
本发明公开了一种海洋工程船,该海洋工程船包括:船体,设置有甲板;所述甲板用于存储桩基;海工吊机,设置在所述甲板上;所述海工吊机用于进行桩基施工;倒驳吊机,设置在所述甲板上;所述桩基存储区用于将运桩船上的桩基倒驳至所述甲板的桩基存储区;当运桩船无法及时供应时,通过甲板上的桩基进行桩基施工。可以扩大船体的甲板面积,使得甲板能够储存一定量的桩基。这样的话,即使运桩船在海上作业窗口期无法及时供应,施工人员也可以过甲板上的桩基进行桩基施工,能够充分利用海上作业窗口期,保证了船机进行桩基施工的连续性,提高作业效率。
Ocean engineering ship
The invention discloses an ocean engineering ship which comprises a ship body provided with a deck; the deck is used for storing pile foundations; the maritime work crane is arranged on the deck; the maritime work crane is used for pile foundation construction; the inverted barge crane is arranged on the deck; the pile foundation storage area is used for inversely barging a pile foundation on a pile transporting ship to the pile foundation storage area of the deck; and when the pile transporting ship cannot supply in time, pile foundation construction is conducted through the pile foundations on the deck. The deck area of the ship body can be enlarged, so that a deck can store a certain amount of pile foundations. Therefore, even if the pile transporting ship cannot supply the pile in time in the offshore operation window period, constructors can carry out pile foundation construction through the pile foundation on the deck, the offshore operation window period can be fully utilized, the continuity of pile foundation construction of a ship machine is guaranteed, and the operation efficiency is improved.
本发明公开了一种海洋工程船,该海洋工程船包括:船体,设置有甲板;所述甲板用于存储桩基;海工吊机,设置在所述甲板上;所述海工吊机用于进行桩基施工;倒驳吊机,设置在所述甲板上;所述桩基存储区用于将运桩船上的桩基倒驳至所述甲板的桩基存储区;当运桩船无法及时供应时,通过甲板上的桩基进行桩基施工。可以扩大船体的甲板面积,使得甲板能够储存一定量的桩基。这样的话,即使运桩船在海上作业窗口期无法及时供应,施工人员也可以过甲板上的桩基进行桩基施工,能够充分利用海上作业窗口期,保证了船机进行桩基施工的连续性,提高作业效率。
Ocean engineering ship
一种海洋工程船
ZHANG QINGTAO (author) / YUAN XINYONG (author) / LU PENG (author) / LU CHENGLIN (author) / YAN YUCHENG (author) / ZHOU SHENGMING (author) / CAO YONG (author) / DING SHENGXIAO (author) / WANG HUAIMING (author) / LU GUOJIE (author)
2023-05-09
Patent
Electronic Resource
Chinese