Continuous beam bridge hanging basket device and construction method thereof
The invention belongs to the technical field of continuous beam bridge construction, particularly relates to a continuous beam bridge hanging basket device and a construction method thereof, and solves the problem of long construction time of a continuous beam bridge hanging basket in the prior art, and the specific scheme is as follows: the continuous beam bridge hanging basket device structurally comprises a No.0 block, two No.1 blocks and two hanging basket devices, a guide rail set is anchored on the upper end face of the No.0 block, two hanging basket devices are arranged on the guide rail set, the two hanging basket devices are provided with front support parts and rear support leg parts, the front support parts and the rear support leg parts are detachable parts, a temporary connecting rod set is arranged between the two front support parts, and anchoring assemblies are arranged on the lower sides of the two front support parts. According to the method, the two hanging baskets are erected on the No.0 block, pouring construction of the No.0 block is conducted through the front support parts of the hanging baskets, one hanging basket is assembled and completely moved forwards, then the other hanging basket is assembled and completely moved forwards, the mode that a support system of the No.0 block is additionally erected and constructed is not needed, and the construction progress can be accelerated.
本发明是属于连续梁桥建设施工技术领域,尤其是涉及到了一种连续梁桥挂篮装置及其施工方法,解决了现有技术中连续梁桥挂篮存在施工时间长的问题,具体方案如下:一种连续梁桥挂篮装置结构包括0号块、两个1号块、两个挂篮装置,0号块上端面锚固有导轨组,导轨组上设置有两个挂篮装置,两个挂篮装置设有前支架部和后支脚部,前支架部和后支脚部均为可拆卸部位,两个前支架部间设有临时连接杆组,两个前支架部下侧设有锚固组件。本发明通过在0号块架设两个挂篮,通过挂篮的前支架部进行1号块的浇筑施工,先将一个挂篮拼装完整地向前移动后将另一个挂篮拼装完整前移,无需另外架设施工1号块的支架体系的方式,有利于加快施工进度。
Continuous beam bridge hanging basket device and construction method thereof
The invention belongs to the technical field of continuous beam bridge construction, particularly relates to a continuous beam bridge hanging basket device and a construction method thereof, and solves the problem of long construction time of a continuous beam bridge hanging basket in the prior art, and the specific scheme is as follows: the continuous beam bridge hanging basket device structurally comprises a No.0 block, two No.1 blocks and two hanging basket devices, a guide rail set is anchored on the upper end face of the No.0 block, two hanging basket devices are arranged on the guide rail set, the two hanging basket devices are provided with front support parts and rear support leg parts, the front support parts and the rear support leg parts are detachable parts, a temporary connecting rod set is arranged between the two front support parts, and anchoring assemblies are arranged on the lower sides of the two front support parts. According to the method, the two hanging baskets are erected on the No.0 block, pouring construction of the No.0 block is conducted through the front support parts of the hanging baskets, one hanging basket is assembled and completely moved forwards, then the other hanging basket is assembled and completely moved forwards, the mode that a support system of the No.0 block is additionally erected and constructed is not needed, and the construction progress can be accelerated.
本发明是属于连续梁桥建设施工技术领域,尤其是涉及到了一种连续梁桥挂篮装置及其施工方法,解决了现有技术中连续梁桥挂篮存在施工时间长的问题,具体方案如下:一种连续梁桥挂篮装置结构包括0号块、两个1号块、两个挂篮装置,0号块上端面锚固有导轨组,导轨组上设置有两个挂篮装置,两个挂篮装置设有前支架部和后支脚部,前支架部和后支脚部均为可拆卸部位,两个前支架部间设有临时连接杆组,两个前支架部下侧设有锚固组件。本发明通过在0号块架设两个挂篮,通过挂篮的前支架部进行1号块的浇筑施工,先将一个挂篮拼装完整地向前移动后将另一个挂篮拼装完整前移,无需另外架设施工1号块的支架体系的方式,有利于加快施工进度。
Continuous beam bridge hanging basket device and construction method thereof
一种连续梁桥挂篮装置及其施工方法
LIU HAIQING (author) / LI FUYUAN (author) / ZHANG JINYANG (author) / WANG LIANG (author) / GONG XIANG'EN (author) / LEI MING (author) / CHEN ZIMU (author) / LI ZHONGLIANG (author)
2023-05-09
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Continuous beam bridge hanging basket automatic moving device
European Patent Office | 2021
|