A platform for research: civil engineering, architecture and urbanism
Large cantilever bent cap suspension support and setting method
The invention discloses a large cantilever bent cap suspension support which comprises a main beam, a main inclined rod and an inner web member, the main beam comprises a first split body and a second split body which are spliced, and the first split body and the second split body are connected through a pin shaft; the large cantilever bent cap suspension support is arranged on the pier column, a reserved hole is embedded in the pier column, and the large cantilever bent cap suspension support is connected to the reserved hole in a supporting mode through a steel bar. The main beam has the advantages that the first split body and the second split body in the main beam are connected through the pin shaft, assembly and disassembly are fast, tightening work of 50-100 bolts is omitted through the pin shaft, and off-site conversion use is easy; steel and cost are saved, and economic benefits are high; all the components are small rod pieces, off-site transportation is convenient and safe, and limited factors are few; the splicing workload is small, and the labor time of workers is shortened.
本发明公开了一种大悬臂盖梁悬挂支架,包括主梁、主斜杆和内腹杆,主梁包括拼接式的第一分体和第二分体,第一分体和第二分体之间采用销轴连接;所述大悬臂盖梁悬挂支架设置在墩柱上,墩柱上埋设有预留孔,大悬臂盖梁悬挂支架通过钢棒支撑连接在预留孔处。本发明好处是主梁中的第一分体和第二分体采用销轴连接的方式,安拆快捷,通过销轴省去50‑100个螺栓的拧紧工作,易于场外转换使用;节省钢材,节约成本,经济效益高;均为小杆件,场外运输方便,安全,受限因素较少;拼接工作量少,减少工人劳动时间。
Large cantilever bent cap suspension support and setting method
The invention discloses a large cantilever bent cap suspension support which comprises a main beam, a main inclined rod and an inner web member, the main beam comprises a first split body and a second split body which are spliced, and the first split body and the second split body are connected through a pin shaft; the large cantilever bent cap suspension support is arranged on the pier column, a reserved hole is embedded in the pier column, and the large cantilever bent cap suspension support is connected to the reserved hole in a supporting mode through a steel bar. The main beam has the advantages that the first split body and the second split body in the main beam are connected through the pin shaft, assembly and disassembly are fast, tightening work of 50-100 bolts is omitted through the pin shaft, and off-site conversion use is easy; steel and cost are saved, and economic benefits are high; all the components are small rod pieces, off-site transportation is convenient and safe, and limited factors are few; the splicing workload is small, and the labor time of workers is shortened.
本发明公开了一种大悬臂盖梁悬挂支架,包括主梁、主斜杆和内腹杆,主梁包括拼接式的第一分体和第二分体,第一分体和第二分体之间采用销轴连接;所述大悬臂盖梁悬挂支架设置在墩柱上,墩柱上埋设有预留孔,大悬臂盖梁悬挂支架通过钢棒支撑连接在预留孔处。本发明好处是主梁中的第一分体和第二分体采用销轴连接的方式,安拆快捷,通过销轴省去50‑100个螺栓的拧紧工作,易于场外转换使用;节省钢材,节约成本,经济效益高;均为小杆件,场外运输方便,安全,受限因素较少;拼接工作量少,减少工人劳动时间。
Large cantilever bent cap suspension support and setting method
一种大悬臂盖梁悬挂支架及设置方法
YAO FENG (author) / HE JIANGUO (author) / JIANG XINCHUN (author) / DONG YA (author) / TIAN ZHUANG (author) / HUANG LONG (author) / XIE CHENGRU (author) / GONG ZHONGPENG (author) / JUNG HA-MYUNG (author) / LI SUYUN (author)
2023-05-12
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Large cantilever bent cap support and construction method
European Patent Office | 2024
|Prestressed cantilever support structure of large cantilever bent cap and construction method
European Patent Office | 2020
|Large cantilever bent cap support system and construction method
European Patent Office | 2023
|High-pier large-cantilever bent cap support and construction method
European Patent Office | 2023
|