Roof parapet GRC flashing node structure and construction method thereof
The invention discloses a roof parapet GRC flashing node structure and a construction method thereof. A slope making layer, a waterproof layer, a heat preservation layer and a protection layer are sequentially arranged from the top of a roof from inside to outside. The waterproof layer, the concrete layer and the finished flashing are sequentially arranged from inside to outside from the inner side wall of the parapet wall; the waterproof layer of the roof and the waterproof layer of the parapet wall are connected into a whole; one side of the thermal insulation layer and/or the protective layer is in liquid sealing connection with the side wall of the finished flashing; the finished flashing is prefabricated in a factory, the structural size is accurate, the elevation is easy to control during field installation, and the appearance is basically kept consistent after installation and is very attractive. And the cracking phenomenon is avoided, and quality repair is reduced. The parapet wall flashing can be manufactured in a segmented mode in advance outside a site and is spliced and installed along the parapet wall by a circle after being transported to the construction site, the construction speed is high, and the construction period is shortened.
本发明公开了一种屋面女儿墙GRC泛水节点结构及其施工方法,从屋面顶部开始由内向外依次设置的找坡层、防水层、保温层和保护层;从女儿墙内侧壁开始由内向外依次设置的防水层、混凝土层和成品泛水;所述屋面的防水层和女儿墙的防水层连成一体;所述保温层和/或保护层一侧与成品泛水侧壁液密封连接;成品泛水采用工厂预制,结构尺寸精确,现场安装时,标高容易控制,安装后外形基本保持一致,非常美观。不会发生开裂现象,减少质量返修。女儿墙泛水可以场外提前分段制作,运至施工现场后沿女儿墙一圈拼接安装即可,施工速度快,节约工期。
Roof parapet GRC flashing node structure and construction method thereof
The invention discloses a roof parapet GRC flashing node structure and a construction method thereof. A slope making layer, a waterproof layer, a heat preservation layer and a protection layer are sequentially arranged from the top of a roof from inside to outside. The waterproof layer, the concrete layer and the finished flashing are sequentially arranged from inside to outside from the inner side wall of the parapet wall; the waterproof layer of the roof and the waterproof layer of the parapet wall are connected into a whole; one side of the thermal insulation layer and/or the protective layer is in liquid sealing connection with the side wall of the finished flashing; the finished flashing is prefabricated in a factory, the structural size is accurate, the elevation is easy to control during field installation, and the appearance is basically kept consistent after installation and is very attractive. And the cracking phenomenon is avoided, and quality repair is reduced. The parapet wall flashing can be manufactured in a segmented mode in advance outside a site and is spliced and installed along the parapet wall by a circle after being transported to the construction site, the construction speed is high, and the construction period is shortened.
本发明公开了一种屋面女儿墙GRC泛水节点结构及其施工方法,从屋面顶部开始由内向外依次设置的找坡层、防水层、保温层和保护层;从女儿墙内侧壁开始由内向外依次设置的防水层、混凝土层和成品泛水;所述屋面的防水层和女儿墙的防水层连成一体;所述保温层和/或保护层一侧与成品泛水侧壁液密封连接;成品泛水采用工厂预制,结构尺寸精确,现场安装时,标高容易控制,安装后外形基本保持一致,非常美观。不会发生开裂现象,减少质量返修。女儿墙泛水可以场外提前分段制作,运至施工现场后沿女儿墙一圈拼接安装即可,施工速度快,节约工期。
Roof parapet GRC flashing node structure and construction method thereof
一种屋面女儿墙GRC泛水节点结构及其施工方法
OU BAOPING (author) / LIU HUOSHENG (author) / LYU PANLONG (author) / ZHAO DEJUN (author)
2023-05-12
Patent
Electronic Resource
Chinese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Prefabricated roof parapet flashing structure and construction method thereof
European Patent Office | 2024
|Roof parapet wall prefabricated flashing construction method
European Patent Office | 2024
|Construction method of roof parapet wall flashing protection layer
European Patent Office | 2020
|Roof parapet wall decoration flashing PC steel mold and construction method thereof
European Patent Office | 2021
|