Method for building desert road
The invention discloses a method for building a desert road. The method comprises the following steps: (1) carrying out construction lofting; (2) removing the original ground; (3) pushing and building a sand foundation; (4) layering and initial pressing; (5) leveling and re-pressing; (6) vibrating and rolling; (7) geotextile and natural gravel are laid; (8) rolling the surface layer; (9) sprinkling water, rolling and maintaining; (10) paving a pavement base layer; (11) vibrating and rolling; (12) after vibration rolling, paving desert sand, sprinkling a sandy soil curing agent on the desert sand, adding water on site, stirring the sandy soil curing agent and the desert sand, and paving to form a gravel base layer; (13) after sufficient curing, sprinkling water, rolling and curing; and (14) asphalt surface construction is conducted, the construction efficiency can be greatly improved, and the compaction degree and the rebound modulus of a road can be improved.
本发明公开了一种修筑沙漠公路的方法,包括以下步骤:(1)施工放样;(2)原地面清除;(3)推筑沙基;(4)分层初压;(5)调平复压;(6)振动碾压;(7)铺设土工布及天然砂砾;(8)表层碾压;(9)洒水碾压、养护;(10)铺筑路面基层;(11)振动碾压;(12)振动碾压后,铺上沙漠砂,并在沙漠砂上洒上砂土固化剂,现场加水,对砂土固化剂和沙漠砂进行搅拌并铺平形成砂砾基层;(13)充分固化后,洒水碾压、养护;(14)进行沥青面施工,能够大大提高施工效率,能够提高公路的压实度和回弹模量。
Method for building desert road
The invention discloses a method for building a desert road. The method comprises the following steps: (1) carrying out construction lofting; (2) removing the original ground; (3) pushing and building a sand foundation; (4) layering and initial pressing; (5) leveling and re-pressing; (6) vibrating and rolling; (7) geotextile and natural gravel are laid; (8) rolling the surface layer; (9) sprinkling water, rolling and maintaining; (10) paving a pavement base layer; (11) vibrating and rolling; (12) after vibration rolling, paving desert sand, sprinkling a sandy soil curing agent on the desert sand, adding water on site, stirring the sandy soil curing agent and the desert sand, and paving to form a gravel base layer; (13) after sufficient curing, sprinkling water, rolling and curing; and (14) asphalt surface construction is conducted, the construction efficiency can be greatly improved, and the compaction degree and the rebound modulus of a road can be improved.
本发明公开了一种修筑沙漠公路的方法,包括以下步骤:(1)施工放样;(2)原地面清除;(3)推筑沙基;(4)分层初压;(5)调平复压;(6)振动碾压;(7)铺设土工布及天然砂砾;(8)表层碾压;(9)洒水碾压、养护;(10)铺筑路面基层;(11)振动碾压;(12)振动碾压后,铺上沙漠砂,并在沙漠砂上洒上砂土固化剂,现场加水,对砂土固化剂和沙漠砂进行搅拌并铺平形成砂砾基层;(13)充分固化后,洒水碾压、养护;(14)进行沥青面施工,能够大大提高施工效率,能够提高公路的压实度和回弹模量。
Method for building desert road
一种修筑沙漠公路的方法
ZHU CHUNSHENG (author) / AIKELA MUJIANG (author) / ZHU YUPING (author) / YUN LAN (author) / LIU JIE (author) / ZHANG GUANGHUI (author) / LU HUIYU (author) / FANG HUA (author)
2023-05-16
Patent
Electronic Resource
Chinese
California's largest single desert road-building program nears completion
Engineering Index Backfile | 1933
15-year desert road plan starts
Engineering Index Backfile | 1964
Experiment on desert road with asphaltic pavement
Engineering Index Backfile | 1921