A platform for research: civil engineering, architecture and urbanism
Cantilever platform and erecting method thereof
The invention discloses an overhanging platform and an erecting method thereof.The overhanging platform comprises a plurality of overhanging frames, each overhanging frame comprises a horizontal upper chord, a horizontal lower chord and a first inclined supporting rod, the horizontal upper chord comprises a first fixing part and a first extending part which are integrally formed, the first fixing part is fixed to a steep cliff rock wall, and the first extending part is fixed to the first lower chord; the first extension part extends in the horizontal direction away from one side of the steep cliff rock wall; the horizontal lower chord is located below the horizontal upper chord and comprises a second fixing part and a second extending part which are integrally formed, the second fixing part is fixed to the steep cliff rock wall, and the second extending part extends in the horizontal direction away from the side of the steep cliff rock wall; one end of the first inclined support rod is fixed on one side of the first extension part far away from the cliff rock wall, and the opposite end is fixed on the second extension part and close to the cliff rock wall; according to the technical scheme, the problems that in the prior art, a scaffold is difficult to erect on the rock wall of the steep cliff and is not stable enough can be solved.
本发明公开一种悬挑平台及其搭设方法,该悬挑平台包括:多个悬挑架,每一个悬挑架包括水平上弦杆、水平下弦杆以及第一斜撑杆,水平上弦杆包括一体成型的第一固定部和第一延伸部,第一固定部固定于陡崖岩壁上,第一延伸部沿背离陡崖岩壁一侧的水平方向上延伸;水平下弦杆位于水平上弦杆下方,水平下弦杆包括一体成型的第二固定部和第二延伸部,第二固定部固定于陡崖岩壁上,第二延伸部沿背离陡崖岩壁一侧的水平方向上延伸;第一斜撑杆一端固定于第一延伸部远离陡崖岩壁的一侧,相对的另一端固定于第二延伸部并靠近陡崖岩壁设置;本发明技术方案能够解决现有技术中,脚手架难以在陡崖岩壁上搭设,不够稳定的问题。
Cantilever platform and erecting method thereof
The invention discloses an overhanging platform and an erecting method thereof.The overhanging platform comprises a plurality of overhanging frames, each overhanging frame comprises a horizontal upper chord, a horizontal lower chord and a first inclined supporting rod, the horizontal upper chord comprises a first fixing part and a first extending part which are integrally formed, the first fixing part is fixed to a steep cliff rock wall, and the first extending part is fixed to the first lower chord; the first extension part extends in the horizontal direction away from one side of the steep cliff rock wall; the horizontal lower chord is located below the horizontal upper chord and comprises a second fixing part and a second extending part which are integrally formed, the second fixing part is fixed to the steep cliff rock wall, and the second extending part extends in the horizontal direction away from the side of the steep cliff rock wall; one end of the first inclined support rod is fixed on one side of the first extension part far away from the cliff rock wall, and the opposite end is fixed on the second extension part and close to the cliff rock wall; according to the technical scheme, the problems that in the prior art, a scaffold is difficult to erect on the rock wall of the steep cliff and is not stable enough can be solved.
本发明公开一种悬挑平台及其搭设方法,该悬挑平台包括:多个悬挑架,每一个悬挑架包括水平上弦杆、水平下弦杆以及第一斜撑杆,水平上弦杆包括一体成型的第一固定部和第一延伸部,第一固定部固定于陡崖岩壁上,第一延伸部沿背离陡崖岩壁一侧的水平方向上延伸;水平下弦杆位于水平上弦杆下方,水平下弦杆包括一体成型的第二固定部和第二延伸部,第二固定部固定于陡崖岩壁上,第二延伸部沿背离陡崖岩壁一侧的水平方向上延伸;第一斜撑杆一端固定于第一延伸部远离陡崖岩壁的一侧,相对的另一端固定于第二延伸部并靠近陡崖岩壁设置;本发明技术方案能够解决现有技术中,脚手架难以在陡崖岩壁上搭设,不够稳定的问题。
Cantilever platform and erecting method thereof
悬挑平台及其搭设方法
ZOU YANG (author) / MA JUNSHAN (author) / MA RUICHENG (author) / HE DONG (author) / LIU RONGHUO (author) / LIU WEIJIE (author) / SU ZHIWEI (author) / WANG HUAN (author)
2023-05-16
Patent
Electronic Resource
Chinese
Engineering Index Backfile | 1948