Construction lifting platform additionally provided with elevator shaft and construction method
The invention discloses a construction lifting platform additionally provided with an elevator shaft and a construction method.The lifting platform comprises a constructed wall, four or more sets of embedded boxes are symmetrically installed on the constructed wall, and an upper climbing bracket beam and a lower climbing bracket beam are installed on the upper set of embedded boxes and the lower set of embedded boxes correspondingly; a lifting motor is installed at the bottom of the upper climbing bracket beam, an inner wall formwork and a formwork reinforcing piece are placed on the top of the upper climbing bracket beam, a horizontal telescopic rod is designed on the inner wall formwork, and automatic formwork removal and installation can be achieved. A supporting stand column is installed on the lower climbing bracket beam, a climbing rail is installed on the side face of the supporting stand column, an operation platform is installed at the two-thirds height of the supporting stand column, a hanging platform and a cantilever crane are installed at the top of the supporting stand column, and a hanging frame and an outer wall formwork assembly are hung below the hanging platform. By arranging the cantilever crane, the hanging platform, the operation platform, the hanging frame, the formwork and the motor lifting system, the construction lifting platform of the elevator shaft is formed, in the construction process, overall lifting of the platform can be achieved through the motor, material lifting is achieved through the cantilever crane, the construction efficiency and safety of the elevator shaft are improved, labor is saved, and the construction time is shortened.
本发明公开了一种加装电梯井道施工提升平台及施工办法,该提升平台包括已施工墙体,在已施工墙体上对称地安装有四组以上的预埋盒子,在上面和下面两组预埋盒子上分别安装有上爬升托架梁和下爬升托架梁,在上爬升托架梁的底部安装有提升电机,在其顶部搁置内墙模板及模板加固件,内墙模板设计有水平收缩杆,可实现自动拆模与安装;在下爬升托架梁上安装支撑立柱,支撑立柱的侧面安装有爬升轨道,支撑立柱的三分之二高度安装有操作平台,在支撑立柱的顶部安装有吊挂平台和悬臂吊,在吊挂平台下面悬吊挂架及外墙模板组件。本发明通过布设悬臂吊、吊挂平台、操作平台、挂架、模板及电机提升系统,形成了电梯井道的施工提升平台,施工过程中可以通过电机实现平台整体提升,悬臂吊实现物料吊运,提高了电梯井道的施工效率及安全性,节约了人工,缩短了施工时间。
Construction lifting platform additionally provided with elevator shaft and construction method
The invention discloses a construction lifting platform additionally provided with an elevator shaft and a construction method.The lifting platform comprises a constructed wall, four or more sets of embedded boxes are symmetrically installed on the constructed wall, and an upper climbing bracket beam and a lower climbing bracket beam are installed on the upper set of embedded boxes and the lower set of embedded boxes correspondingly; a lifting motor is installed at the bottom of the upper climbing bracket beam, an inner wall formwork and a formwork reinforcing piece are placed on the top of the upper climbing bracket beam, a horizontal telescopic rod is designed on the inner wall formwork, and automatic formwork removal and installation can be achieved. A supporting stand column is installed on the lower climbing bracket beam, a climbing rail is installed on the side face of the supporting stand column, an operation platform is installed at the two-thirds height of the supporting stand column, a hanging platform and a cantilever crane are installed at the top of the supporting stand column, and a hanging frame and an outer wall formwork assembly are hung below the hanging platform. By arranging the cantilever crane, the hanging platform, the operation platform, the hanging frame, the formwork and the motor lifting system, the construction lifting platform of the elevator shaft is formed, in the construction process, overall lifting of the platform can be achieved through the motor, material lifting is achieved through the cantilever crane, the construction efficiency and safety of the elevator shaft are improved, labor is saved, and the construction time is shortened.
本发明公开了一种加装电梯井道施工提升平台及施工办法,该提升平台包括已施工墙体,在已施工墙体上对称地安装有四组以上的预埋盒子,在上面和下面两组预埋盒子上分别安装有上爬升托架梁和下爬升托架梁,在上爬升托架梁的底部安装有提升电机,在其顶部搁置内墙模板及模板加固件,内墙模板设计有水平收缩杆,可实现自动拆模与安装;在下爬升托架梁上安装支撑立柱,支撑立柱的侧面安装有爬升轨道,支撑立柱的三分之二高度安装有操作平台,在支撑立柱的顶部安装有吊挂平台和悬臂吊,在吊挂平台下面悬吊挂架及外墙模板组件。本发明通过布设悬臂吊、吊挂平台、操作平台、挂架、模板及电机提升系统,形成了电梯井道的施工提升平台,施工过程中可以通过电机实现平台整体提升,悬臂吊实现物料吊运,提高了电梯井道的施工效率及安全性,节约了人工,缩短了施工时间。
Construction lifting platform additionally provided with elevator shaft and construction method
一种加装电梯井道施工提升平台及施工办法
LIN XIAONAN (author) / LIN JIANFENG (author) / LIN XIAOXI (author)
2023-05-16
Patent
Electronic Resource
Chinese
Supporting frame additionally provided with elevator shaft
European Patent Office | 2023
|Elevator shaft lifting construction protection operation platform
European Patent Office | 2022
|Multi-point elevator shaft construction lifting platform and construction method
European Patent Office | 2021
|Self-lifting method of elevator shaft construction operation platform
European Patent Office | 2022
|