Construction method of oversized plate honeycomb aluminum plate suspended ceiling
A construction method for an oversized honeycomb aluminum plate suspended ceiling relates to the technical field of suspended ceiling installation and comprises the steps that roof data are measured before construction, BIM modeling is carried out, then safety equipment is set up, during construction, keels are welded firstly, then honeycomb aluminum plates are assembled on a fixing frame according to scanning and modeling data, and the honeycomb aluminum plates are installed on the fixing frame; then the aluminum plate unit blocks are integrally lifted through an oversized plate honeycomb aluminum plate lifting device and are installed through cooperation of constructors above and below the aluminum plate unit blocks, and after overall installation is completed, quality inspection and acceptance are conducted; through the cooperation of the front, middle and later stages of construction, the waste of materials is avoided while the precise installation of the super-large honeycomb aluminum plate is ensured, and the personal safety of constructors during high-altitude operation is effectively ensured; the oversized plate honeycomb aluminum plate lifting device is used for lifting the oversized plate honeycomb aluminum plate, so that the labor intensity of constructors is reduced, and deformation of the oversized plate honeycomb aluminum plate during lifting is avoided.
一种超大板块蜂窝铝板吊顶施工方法,涉及吊顶安装技术领域,包括施工前测量屋顶数据并BIM建模然后搭建设置安全设备,施工时首先焊接龙骨,再根据扫描和建模数据在固定架上组装蜂窝铝板,然后使用超大板块蜂窝铝板抬升装置将铝板单元块整体抬升,并由上方和下方施工人员配合进行安装,整体安装完成后,进行质检验收;通过施工前中后期的配合,在保证超大板块蜂窝铝板的精确安装的同时避免材料的浪费,还有效的保证的施工人员高空作业时的人身安全;通过在抬升超大板块蜂窝铝板使用超大板块蜂窝铝板抬升装置,降低施工人员劳动强度,并且避免超大板块蜂窝铝板在抬升时产生形变。
Construction method of oversized plate honeycomb aluminum plate suspended ceiling
A construction method for an oversized honeycomb aluminum plate suspended ceiling relates to the technical field of suspended ceiling installation and comprises the steps that roof data are measured before construction, BIM modeling is carried out, then safety equipment is set up, during construction, keels are welded firstly, then honeycomb aluminum plates are assembled on a fixing frame according to scanning and modeling data, and the honeycomb aluminum plates are installed on the fixing frame; then the aluminum plate unit blocks are integrally lifted through an oversized plate honeycomb aluminum plate lifting device and are installed through cooperation of constructors above and below the aluminum plate unit blocks, and after overall installation is completed, quality inspection and acceptance are conducted; through the cooperation of the front, middle and later stages of construction, the waste of materials is avoided while the precise installation of the super-large honeycomb aluminum plate is ensured, and the personal safety of constructors during high-altitude operation is effectively ensured; the oversized plate honeycomb aluminum plate lifting device is used for lifting the oversized plate honeycomb aluminum plate, so that the labor intensity of constructors is reduced, and deformation of the oversized plate honeycomb aluminum plate during lifting is avoided.
一种超大板块蜂窝铝板吊顶施工方法,涉及吊顶安装技术领域,包括施工前测量屋顶数据并BIM建模然后搭建设置安全设备,施工时首先焊接龙骨,再根据扫描和建模数据在固定架上组装蜂窝铝板,然后使用超大板块蜂窝铝板抬升装置将铝板单元块整体抬升,并由上方和下方施工人员配合进行安装,整体安装完成后,进行质检验收;通过施工前中后期的配合,在保证超大板块蜂窝铝板的精确安装的同时避免材料的浪费,还有效的保证的施工人员高空作业时的人身安全;通过在抬升超大板块蜂窝铝板使用超大板块蜂窝铝板抬升装置,降低施工人员劳动强度,并且避免超大板块蜂窝铝板在抬升时产生形变。
Construction method of oversized plate honeycomb aluminum plate suspended ceiling
一种超大板块蜂窝铝板吊顶施工方法
XU ZHI (author) / CHEN HE (author) / MA YIBIN (author) / HU JINGWEI (author) / ZHANG GUOHUI (author) / LI MENG (author) / WU YANAN (author) / XIA QIUYAN (author) / LIU LBNP (author) / ZHANG JIN (author)
2023-05-19
Patent
Electronic Resource
Chinese
European Patent Office | 2022
|Aluminum honeycomb plate composite plate suspended ceiling system
European Patent Office | 2020
|Honeycomb aluminum plate suspended ceiling structure and construction method thereof
European Patent Office | 2024
|