A platform for research: civil engineering, architecture and urbanism
Building engineering construction equipment and construction method
The building engineering construction equipment comprises at least two installation frames, studs are inserted into the two ends of the installation frames in a penetrating mode, first nuts are connected to the two ends of the studs in a threaded mode, side blocks are arranged on the two sides of the installation frames, hanging rings are connected to the side blocks, and the hanging rings are connected with a traction rope of an external winch through anti-disengaging clamping locks. Sliding limiting mechanisms capable of limiting the mounting frames from shaking in the process of sliding up and down along the flower stand beam columns are arranged in the mounting frames. A motor drives a gear to rotate and drives a rotating frame to rotate, under the action of an automatic drilling mechanism, a rotating drill bit drills and pulls out a flower stand beam column, due to the fact that the rotating frame can rotate around an attached gear ring, all side positions of the beam column can be drilled, manual lifting and drilling are not needed, safety is high, and work efficiency is improved. Due to the fact that holes can be drilled around the flower stand beam column, all side faces of the flower stand beam column can be drilled, and the whole drilling process is more convenient.
本发明公开了一种建筑工程施工设备及施工方法,包括至少两个安装架,安装架的两端穿插有螺柱且螺柱的两端螺接有第一螺母,安装架的两侧设置有边块,边块上连接有挂环且挂环通过防脱卡锁与外设卷扬机的牵引绳连接,安装架内均设置有可限制安装架沿花架梁柱上下滑动过程中晃动的滑动限位机构。通过电机带动齿轮旋转,带动旋框旋转,在自动钻孔机构的作用下,实现让旋转的钻头对花架梁柱上钻孔和拔出,由于旋框可围绕着贴合的齿轮环旋转,从而能够实现对梁柱各个侧位进行钻孔,无需人工吊高钻孔,安全性高,由于可环绕花架梁柱钻孔,能够实现对花架梁柱各个侧面钻孔,整个钻花过程更加方便。
Building engineering construction equipment and construction method
The building engineering construction equipment comprises at least two installation frames, studs are inserted into the two ends of the installation frames in a penetrating mode, first nuts are connected to the two ends of the studs in a threaded mode, side blocks are arranged on the two sides of the installation frames, hanging rings are connected to the side blocks, and the hanging rings are connected with a traction rope of an external winch through anti-disengaging clamping locks. Sliding limiting mechanisms capable of limiting the mounting frames from shaking in the process of sliding up and down along the flower stand beam columns are arranged in the mounting frames. A motor drives a gear to rotate and drives a rotating frame to rotate, under the action of an automatic drilling mechanism, a rotating drill bit drills and pulls out a flower stand beam column, due to the fact that the rotating frame can rotate around an attached gear ring, all side positions of the beam column can be drilled, manual lifting and drilling are not needed, safety is high, and work efficiency is improved. Due to the fact that holes can be drilled around the flower stand beam column, all side faces of the flower stand beam column can be drilled, and the whole drilling process is more convenient.
本发明公开了一种建筑工程施工设备及施工方法,包括至少两个安装架,安装架的两端穿插有螺柱且螺柱的两端螺接有第一螺母,安装架的两侧设置有边块,边块上连接有挂环且挂环通过防脱卡锁与外设卷扬机的牵引绳连接,安装架内均设置有可限制安装架沿花架梁柱上下滑动过程中晃动的滑动限位机构。通过电机带动齿轮旋转,带动旋框旋转,在自动钻孔机构的作用下,实现让旋转的钻头对花架梁柱上钻孔和拔出,由于旋框可围绕着贴合的齿轮环旋转,从而能够实现对梁柱各个侧位进行钻孔,无需人工吊高钻孔,安全性高,由于可环绕花架梁柱钻孔,能够实现对花架梁柱各个侧面钻孔,整个钻花过程更加方便。
Building engineering construction equipment and construction method
一种建筑工程施工设备及施工方法
ZHOU XUEFEN (author) / LIU XIQUAN (author) / ZHAO XIWANG (author) / WANG ZHIYOU (author) / LI YONGPENG (author)
2023-05-23
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Building engineering construction equipment and construction method
European Patent Office | 2021
|Crushing equipment for building construction engineering construction
European Patent Office | 2023
|Building construction engineering wall building equipment
European Patent Office | 2023
|Building construction engineering wall building equipment
European Patent Office | 2024
|