A platform for research: civil engineering, architecture and urbanism
River test simulation system and simulation method
A river test simulation system comprises a test simulation subsystem, a water supply circulation subsystem and a water return circulation subsystem. The test simulation subsystem comprises a circulating water tank, an inlet steady flow module, a river evolution treatment module and an outlet blocking and filtering energy dissipation module, the river evolution treatment module is located in the circulating water tank, the inlet steady flow module is arranged at the inlet end of the test simulation subsystem, and the outlet blocking and filtering energy dissipation module is arranged at the outlet end of the test simulation subsystem; the river evolution treatment module comprises a foundation bed made of a thermoplastic material, and nicks and holes are formed in the foundation bed; water flow output by the water supply circulation subsystem enters the river evolution treatment module through the inlet flow stabilization module and then flows back to the water return circulation subsystem through the outlet blocking and filtering energy dissipation module. The invention further relates to a river test simulation method which adopts the system, and the system is made of a thermoplastic material, can be recycled for the next test after the test is completed, is economical and environment-friendly, and belongs to the field of river test devices.
一种河流试验模拟系统,包括试验模拟子系统、供水循环子系统和回水循环子系统;试验模拟子系统包括循环水槽、进口稳流模块、河流演变治理模块和出口拦滤消能模块,河流演变治理模块位于循环水槽内,进口稳流模块设于试验模拟子系统的进口端,出口拦滤消能模块设于试验模拟子系统的出口端;河流演变治理模块包括由热塑性材料制成的基床,基床上设有刻痕和孔洞;供水循环子系统输出的水流经进口稳流模块进入河流演变治理模块,再经出口拦滤消能模块回流至回水循环子系统。还涉及一种河流试验模拟方法,采用上述系统,本系统采用热塑性材料制作,在试验完成后,可回收用于下一次试验,经济环保,属于河流试验装置领域。
River test simulation system and simulation method
A river test simulation system comprises a test simulation subsystem, a water supply circulation subsystem and a water return circulation subsystem. The test simulation subsystem comprises a circulating water tank, an inlet steady flow module, a river evolution treatment module and an outlet blocking and filtering energy dissipation module, the river evolution treatment module is located in the circulating water tank, the inlet steady flow module is arranged at the inlet end of the test simulation subsystem, and the outlet blocking and filtering energy dissipation module is arranged at the outlet end of the test simulation subsystem; the river evolution treatment module comprises a foundation bed made of a thermoplastic material, and nicks and holes are formed in the foundation bed; water flow output by the water supply circulation subsystem enters the river evolution treatment module through the inlet flow stabilization module and then flows back to the water return circulation subsystem through the outlet blocking and filtering energy dissipation module. The invention further relates to a river test simulation method which adopts the system, and the system is made of a thermoplastic material, can be recycled for the next test after the test is completed, is economical and environment-friendly, and belongs to the field of river test devices.
一种河流试验模拟系统,包括试验模拟子系统、供水循环子系统和回水循环子系统;试验模拟子系统包括循环水槽、进口稳流模块、河流演变治理模块和出口拦滤消能模块,河流演变治理模块位于循环水槽内,进口稳流模块设于试验模拟子系统的进口端,出口拦滤消能模块设于试验模拟子系统的出口端;河流演变治理模块包括由热塑性材料制成的基床,基床上设有刻痕和孔洞;供水循环子系统输出的水流经进口稳流模块进入河流演变治理模块,再经出口拦滤消能模块回流至回水循环子系统。还涉及一种河流试验模拟方法,采用上述系统,本系统采用热塑性材料制作,在试验完成后,可回收用于下一次试验,经济环保,属于河流试验装置领域。
River test simulation system and simulation method
一种河流试验模拟系统和模拟方法
LAI YONGHUI (author)
2023-05-26
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
River slope collapse simulation test device and simulation method
European Patent Office | 2024
|Simulation of meandering river processes
TIBKAT | 1990
|Simulation of meandering river processes
UB Braunschweig | 1990
|Simulation Tool for River Management
British Library Online Contents | 1999
|Arc-shaped foundation pit construction simulation test device and simulation test method thereof
European Patent Office | 2024
|