The invention discloses a temporary supporting method for cave dwellings, and belongs to the technical field of cave dwellings, before the cave dwellings are repaired, transformed, expanded or dismantled, all related cave dwellings are reinforced through full framing, and then construction is conducted through a manual method; the full framing installation comprises the following steps that S100, according to the clear depth of the cave dwellings, the full framing of each cave dwelling is manufactured; s200, mounting is carried out in a sleeving mode from inside to outside, a certain jacking load needs to be applied to each set of support in advance, and the support is kept relatively stable; s300, after the full space of one cave dwelling is installed, multiple sets of supports are needed to conduct upward jacking operation construction at the same time, and prestress is applied in place; s400, the left side gravity type retaining wall is constructed to the top of the arch ring; and S500, after the gravity type retaining wall is completely built, the longitudinal connecting bottom horizontal tube and the transverse connecting bottom horizontal tube of the full framing are completely connected in place in time. The temporary supporting effect can be achieved, building and dismounting are convenient, and using is flexible.
本发明公开了一种窑洞临时支护方法,属于窑洞支护技术领域,在窑洞修复、改造、扩建或拆除之前,对相关窑洞均采用满堂支架进行加固,再采用人工方法进行施工;其中,满堂支架安装包括以下步骤:S100、根据窑洞净深,制作每孔窑洞的满堂支架;S200、由内向外分套进行安装,每套支架均需预先施加一定的顶升荷载,保持相对稳定即可;S300、一孔窑洞的满堂全部安装后,需要多套支架同时进行向上顶进操作施工,并将预应力施加到位;S400、将左侧重力式挡墙施工至拱圈顶部;S500、重力式挡墙全部砌筑完成后,及时将满堂支架的纵向连接扫地杆和横向连接扫地杆全面连接到位。本发明可实现临时支护的作用,方便搭建与拆卸,使用灵活。
Temporary supporting method for cave dwelling
The invention discloses a temporary supporting method for cave dwellings, and belongs to the technical field of cave dwellings, before the cave dwellings are repaired, transformed, expanded or dismantled, all related cave dwellings are reinforced through full framing, and then construction is conducted through a manual method; the full framing installation comprises the following steps that S100, according to the clear depth of the cave dwellings, the full framing of each cave dwelling is manufactured; s200, mounting is carried out in a sleeving mode from inside to outside, a certain jacking load needs to be applied to each set of support in advance, and the support is kept relatively stable; s300, after the full space of one cave dwelling is installed, multiple sets of supports are needed to conduct upward jacking operation construction at the same time, and prestress is applied in place; s400, the left side gravity type retaining wall is constructed to the top of the arch ring; and S500, after the gravity type retaining wall is completely built, the longitudinal connecting bottom horizontal tube and the transverse connecting bottom horizontal tube of the full framing are completely connected in place in time. The temporary supporting effect can be achieved, building and dismounting are convenient, and using is flexible.
本发明公开了一种窑洞临时支护方法,属于窑洞支护技术领域,在窑洞修复、改造、扩建或拆除之前,对相关窑洞均采用满堂支架进行加固,再采用人工方法进行施工;其中,满堂支架安装包括以下步骤:S100、根据窑洞净深,制作每孔窑洞的满堂支架;S200、由内向外分套进行安装,每套支架均需预先施加一定的顶升荷载,保持相对稳定即可;S300、一孔窑洞的满堂全部安装后,需要多套支架同时进行向上顶进操作施工,并将预应力施加到位;S400、将左侧重力式挡墙施工至拱圈顶部;S500、重力式挡墙全部砌筑完成后,及时将满堂支架的纵向连接扫地杆和横向连接扫地杆全面连接到位。本发明可实现临时支护的作用,方便搭建与拆卸,使用灵活。
Temporary supporting method for cave dwelling
一种窑洞临时支护方法
YAO HUI (author) / ZHANG DONGFENG (author) / DU HAOQING (author) / LIU LU (author) / GAO YUXIA (author) / ZHANG LINJIE (author) / DONG QIAN (author) / FU FEI (author)
2023-05-26
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Wiley | 2014
|British Library Conference Proceedings | 1999
|European Patent Office | 2021
|