Concrete main tower construction creeping formwork system
The invention relates to the technical field of bridge construction, and discloses a concrete main tower construction creeping formwork system which comprises a creeping formwork support installed on a top formwork used for constructing a concrete main tower; the demoulding hydraulic system is transversely mounted at the first section of the creeping formwork bracket; the mold closing hydraulic system is transversely mounted at the second section of the creeping formwork bracket; the second section is positioned above the first section; the two sets of template units are detachably connected with the demolding hydraulic system and the mold closing hydraulic system respectively; the formwork lifting system is used for lifting the formwork units located on the first section to the second section. The two formwork units are arranged on the creeping formwork support and matched with the demolding hydraulic system and the mold closing hydraulic system, independent demolding and mold closing of the two formwork units are achieved, the rolling lifting system and the formwork lifting system are matched, alternate lifting of the two formwork units is achieved, and the creeping formwork efficiency can be effectively improved.
本发明涉及桥梁施工技术领域,公开了一种混凝土主塔施工爬模体系,包括:爬模支架,安装在用于施工混凝土主塔的顶模上;脱模液压系统,横向安装在爬模支架的第一节段处;合模液压系统,横向安装在爬模支架的第二节段处;第二节段位于所述第一节段的上方;两套模板单元,分别与所述脱模液压系统和所述合模液压系统可拆式连接;模板提升系统,用于提升位于第一节段的模板单元至第二节段。本发明通过在爬模支架上设置两套模板单元,且配合脱模液压系统和合模液压系统,实现两套模板单元的分别独立的脱模和合模,并配合滚吊系统和模板提升系统,实现两套模板单元的交替提升,可有效提高爬模效率。
Concrete main tower construction creeping formwork system
The invention relates to the technical field of bridge construction, and discloses a concrete main tower construction creeping formwork system which comprises a creeping formwork support installed on a top formwork used for constructing a concrete main tower; the demoulding hydraulic system is transversely mounted at the first section of the creeping formwork bracket; the mold closing hydraulic system is transversely mounted at the second section of the creeping formwork bracket; the second section is positioned above the first section; the two sets of template units are detachably connected with the demolding hydraulic system and the mold closing hydraulic system respectively; the formwork lifting system is used for lifting the formwork units located on the first section to the second section. The two formwork units are arranged on the creeping formwork support and matched with the demolding hydraulic system and the mold closing hydraulic system, independent demolding and mold closing of the two formwork units are achieved, the rolling lifting system and the formwork lifting system are matched, alternate lifting of the two formwork units is achieved, and the creeping formwork efficiency can be effectively improved.
本发明涉及桥梁施工技术领域,公开了一种混凝土主塔施工爬模体系,包括:爬模支架,安装在用于施工混凝土主塔的顶模上;脱模液压系统,横向安装在爬模支架的第一节段处;合模液压系统,横向安装在爬模支架的第二节段处;第二节段位于所述第一节段的上方;两套模板单元,分别与所述脱模液压系统和所述合模液压系统可拆式连接;模板提升系统,用于提升位于第一节段的模板单元至第二节段。本发明通过在爬模支架上设置两套模板单元,且配合脱模液压系统和合模液压系统,实现两套模板单元的分别独立的脱模和合模,并配合滚吊系统和模板提升系统,实现两套模板单元的交替提升,可有效提高爬模效率。
Concrete main tower construction creeping formwork system
一种混凝土主塔施工爬模体系
DAI JUNXIANG (author) / TAO JUN (author) / ZHU HUA (author) / ZHA DAOHONG (author) / ZHANG QIANMING (author) / MAO WEIQI (author) / TIAN JIKAI (author) / LI JUNTANG (author) / CHEN TAO (author) / SHU HAIHUA (author)
2023-05-30
Patent
Electronic Resource
Chinese
Intelligent maintenance system and method for main tower creeping formwork construction
European Patent Office | 2023
|Creeping formwork construction method for towering concrete structure control tower
European Patent Office | 2023
|Construction method of formwork system for highly-deviated tower construction creeping formwork
European Patent Office | 2021
|Multi-software fused intelligent maintenance method for main tower creeping formwork construction
European Patent Office | 2023
|