A platform for research: civil engineering, architecture and urbanism
Wharf breast wall leakage-proof structure, auxiliary tool and leakage-proof method
The invention provides a wharf breast wall leakproof structure, an auxiliary tool and a leakproof method.The leakproof structure comprises a leakproof hole in a breast wall seam, the inner side wall and the inner bottom face of the leakproof hole are all covered with geotechnical cloth films, the geotechnical cloth films are fixed to the inner wall of the leakproof hole, the upper end of the leakproof hole is flush with the top face of a breast wall, and the lower end of the leakproof hole is flush with the bottom face of the breast wall; a blocking structure is arranged at the upper end of the leak-proof hole; the auxiliary tool comprises a vertical pipe and a funnel; the leakage-proof structure is arranged in a breast wall joint and used for preventing leakage at the breast wall joint. The structure and the method have the beneficial effects that manufacturing and operation are simple, the vertical pipe and the funnel can be recycled, the construction cost is low, the construction efficiency is high, and the method is widely applied to construction sites.
本发明提供一种码头胸墙防漏结构、辅助工具及防漏方法,防漏结构包括胸墙接缝处的防漏孔,防漏孔的内侧壁和内部底面上均附满土工布膜,土工布膜固定于防漏孔的内壁上,防漏孔的上端与胸墙的顶面齐平,下端与胸墙的底面齐平,防漏孔上端具有封堵结构;辅助工具包括竖管和漏斗;该防漏结构设置于胸墙接缝内,用于胸墙接缝处防漏。本发明的有益效果结构及方法制作和操作简单,竖管和漏斗可以重复利用,施工成本低,施工效率高,广泛适用于施工现场。
Wharf breast wall leakage-proof structure, auxiliary tool and leakage-proof method
The invention provides a wharf breast wall leakproof structure, an auxiliary tool and a leakproof method.The leakproof structure comprises a leakproof hole in a breast wall seam, the inner side wall and the inner bottom face of the leakproof hole are all covered with geotechnical cloth films, the geotechnical cloth films are fixed to the inner wall of the leakproof hole, the upper end of the leakproof hole is flush with the top face of a breast wall, and the lower end of the leakproof hole is flush with the bottom face of the breast wall; a blocking structure is arranged at the upper end of the leak-proof hole; the auxiliary tool comprises a vertical pipe and a funnel; the leakage-proof structure is arranged in a breast wall joint and used for preventing leakage at the breast wall joint. The structure and the method have the beneficial effects that manufacturing and operation are simple, the vertical pipe and the funnel can be recycled, the construction cost is low, the construction efficiency is high, and the method is widely applied to construction sites.
本发明提供一种码头胸墙防漏结构、辅助工具及防漏方法,防漏结构包括胸墙接缝处的防漏孔,防漏孔的内侧壁和内部底面上均附满土工布膜,土工布膜固定于防漏孔的内壁上,防漏孔的上端与胸墙的顶面齐平,下端与胸墙的底面齐平,防漏孔上端具有封堵结构;辅助工具包括竖管和漏斗;该防漏结构设置于胸墙接缝内,用于胸墙接缝处防漏。本发明的有益效果结构及方法制作和操作简单,竖管和漏斗可以重复利用,施工成本低,施工效率高,广泛适用于施工现场。
Wharf breast wall leakage-proof structure, auxiliary tool and leakage-proof method
码头胸墙防漏结构、辅助工具及防漏方法
ZHAO MINGSHI (author) / LIU AIGUO (author) / WANG WENHUAN (author) / LIU JINQIU (author) / ZHENG JIANMIN (author) / HAO JINGBO (author) / WEI YONG (author) / GUO DONG (author) / ZHANG SHIQIANG (author)
2023-05-30
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
European Patent Office | 2024
|Different-layer drainage leakage-proof flow guide piece and leakage-proof flow guide structure
European Patent Office | 2021
|