A platform for research: civil engineering, architecture and urbanism
Water conservancy project anti-seepage water stop structure and construction method thereof
The invention relates to the technical field of water conservancy projects, and particularly discloses a water conservancy project anti-seepage water stop structure which is mounted at the joint of a first pipeline and a second pipeline and comprises a locking mechanism for locking and fixing the joint of the first pipeline and the second pipeline, and an anti-seepage structure for seepage prevention is arranged at the joint of the first pipeline and the second pipeline. The locking mechanism can lock and fix the joint of the first pipeline and the second pipeline, so that tight connection between the first pipeline and the second pipeline is achieved, and the possibility that the first pipeline and the second pipeline fall off during water flow impact or an earthquake is reduced; and the anti-seepage structure can conduct waterproof sealing on the joint of the first pipeline and the second pipeline, and a better anti-seepage effect can be achieved through cooperation of the locking mechanism.
本申请涉及水利工程技术领域,具体公开了一种水利工程防渗止水结构,安装于第一管道和第二管道的连接处,包括对第一管道和第二管道的对接处进行锁紧固定的锁定机构,且第一管道和第二管道的对接处设置有防渗的防渗结构。本申请中的锁定机构能够对第一管道和第二管道的连接处进行锁紧固定,从而实现对第一管道和第二管道之间的紧密连接,降低了水流冲击或地震时第一管道和第二管道脱落的可能性,防渗结构能够对第一管道和第二管道的连接处进行防水密封,配合锁定机构能够实现更好的防渗效果。
Water conservancy project anti-seepage water stop structure and construction method thereof
The invention relates to the technical field of water conservancy projects, and particularly discloses a water conservancy project anti-seepage water stop structure which is mounted at the joint of a first pipeline and a second pipeline and comprises a locking mechanism for locking and fixing the joint of the first pipeline and the second pipeline, and an anti-seepage structure for seepage prevention is arranged at the joint of the first pipeline and the second pipeline. The locking mechanism can lock and fix the joint of the first pipeline and the second pipeline, so that tight connection between the first pipeline and the second pipeline is achieved, and the possibility that the first pipeline and the second pipeline fall off during water flow impact or an earthquake is reduced; and the anti-seepage structure can conduct waterproof sealing on the joint of the first pipeline and the second pipeline, and a better anti-seepage effect can be achieved through cooperation of the locking mechanism.
本申请涉及水利工程技术领域,具体公开了一种水利工程防渗止水结构,安装于第一管道和第二管道的连接处,包括对第一管道和第二管道的对接处进行锁紧固定的锁定机构,且第一管道和第二管道的对接处设置有防渗的防渗结构。本申请中的锁定机构能够对第一管道和第二管道的连接处进行锁紧固定,从而实现对第一管道和第二管道之间的紧密连接,降低了水流冲击或地震时第一管道和第二管道脱落的可能性,防渗结构能够对第一管道和第二管道的连接处进行防水密封,配合锁定机构能够实现更好的防渗效果。
Water conservancy project anti-seepage water stop structure and construction method thereof
一种水利工程防渗止水结构及其施工方法
HAN SHAOCHANG (author) / HUANG DEKUN (author) / SHI LEI (author)
2023-05-30
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|Anti-seepage and water-stop structure on water conservancy project
European Patent Office | 2015
|Anti-seepage water stop device for water conservancy project
European Patent Office | 2023
|Anti-seepage water stop device for water conservancy project
European Patent Office | 2021
|Anti-seepage water-stop dam for water conservancy project
European Patent Office | 2020
|