A platform for research: civil engineering, architecture and urbanism
Flood prevention box for flood prevention of water conservancy project
The invention relates to the technical field of water conservancy projects, in particular to a flood prevention box for flood prevention of a water conservancy project. The flood prevention box for flood prevention of the water conservancy project comprises a first connecting box, a charging box, a second connecting box, a fixing mechanism, a locking mechanism and the like, the charging box is connected to the first connecting box in a sliding mode, the second connecting box is connected to the charging box in a clamped mode, and the charging box is also connected to the second connecting box in a sliding mode; the fixing mechanism is used for fixing the first connecting box, and a locking mechanism is arranged at the bottom of the second connecting box. A fixing cone can be inserted into the deep position of the ground, so that the fixing effect is achieved, when the second connecting box is clamped to the charging box on the lower side, the charging box filled with sand on the upper side can extrude a first nut to move downwards, a locking block is clamped to a connecting block, the second connecting box is locked accordingly, and the operation is repeated, so that the working efficiency is improved. And the multiple second connecting boxes and the charging boxes can be stacked in multiple layers in the longitudinal direction, and the flood prevention effect is improved.
本发明涉及水利工程技术领域,尤其涉及一种水利工程防洪用的防汛箱。本发明提供了这样一种水利工程防洪用的防汛箱,包括有第一连接箱、装料箱、第二连接箱、固定机构和锁紧机构等,第一连接箱上滑动式连接有装料箱,该装料箱上卡接有第二连接箱,第二连接箱上也滑动式连接有装料箱,固定机构用于对第一连接箱进行固定,第二连接箱底部设有锁紧机构。本发明的固定锥能够插入地面深处,从而起固定作用,当第二连接箱卡接在下侧的装料箱上时,上侧装有沙子的装料箱会挤压第一螺母往下运动,使锁紧块卡接在连接块上,从而对第二连接箱进行锁紧,如此重复操作,即可对多个第二连接箱和装料箱在纵向上进行多层堆叠,提高防洪效果。
Flood prevention box for flood prevention of water conservancy project
The invention relates to the technical field of water conservancy projects, in particular to a flood prevention box for flood prevention of a water conservancy project. The flood prevention box for flood prevention of the water conservancy project comprises a first connecting box, a charging box, a second connecting box, a fixing mechanism, a locking mechanism and the like, the charging box is connected to the first connecting box in a sliding mode, the second connecting box is connected to the charging box in a clamped mode, and the charging box is also connected to the second connecting box in a sliding mode; the fixing mechanism is used for fixing the first connecting box, and a locking mechanism is arranged at the bottom of the second connecting box. A fixing cone can be inserted into the deep position of the ground, so that the fixing effect is achieved, when the second connecting box is clamped to the charging box on the lower side, the charging box filled with sand on the upper side can extrude a first nut to move downwards, a locking block is clamped to a connecting block, the second connecting box is locked accordingly, and the operation is repeated, so that the working efficiency is improved. And the multiple second connecting boxes and the charging boxes can be stacked in multiple layers in the longitudinal direction, and the flood prevention effect is improved.
本发明涉及水利工程技术领域,尤其涉及一种水利工程防洪用的防汛箱。本发明提供了这样一种水利工程防洪用的防汛箱,包括有第一连接箱、装料箱、第二连接箱、固定机构和锁紧机构等,第一连接箱上滑动式连接有装料箱,该装料箱上卡接有第二连接箱,第二连接箱上也滑动式连接有装料箱,固定机构用于对第一连接箱进行固定,第二连接箱底部设有锁紧机构。本发明的固定锥能够插入地面深处,从而起固定作用,当第二连接箱卡接在下侧的装料箱上时,上侧装有沙子的装料箱会挤压第一螺母往下运动,使锁紧块卡接在连接块上,从而对第二连接箱进行锁紧,如此重复操作,即可对多个第二连接箱和装料箱在纵向上进行多层堆叠,提高防洪效果。
Flood prevention box for flood prevention of water conservancy project
一种水利工程防洪用的防汛箱
ZHENG FUMEI (author)
2023-06-02
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau