A platform for research: civil engineering, architecture and urbanism
Waterproof device for deep foundation pit in rail transit construction
The invention relates to the technical field of building equipment, and discloses a rail transit construction deep foundation pit waterproof device which comprises a protection mechanism, an upward jacking mechanism is installed on the upper side of the protection mechanism, a wetting mechanism is arranged at the lower end of the upward jacking mechanism, an adjusting mechanism is installed on the left side of the protection mechanism, and a water inlet connecting pipe is installed on the left side of the adjusting mechanism. Clean water is conveyed to the multiple protection mechanisms through the water inlet connecting pipe, water is supplemented to the pile head in the protection mechanisms, and therefore manual operation is liberated, and water is rapidly and conveniently supplemented to the pile head; continuous water supply maintenance is carried out on the pile head through the humidifying unit, so that water flow acts on the pile head, water flow permeation and dispersion time is given, and the situation that due to the fact that water flows out too much in a short time, water flow flows around the pile head before permeation and dispersion, and the ideal maintenance effect cannot be achieved is avoided.
本发明涉及建筑设备术领域,且公开了一种轨道交通施工深基坑防水装置,包括:防护机构,所述防护机构上侧安装有上顶机构,所述上顶机构下端设置有湿润机构,所防护机构左侧安装有调节机构,所述调节机构左侧安装有进水连管。本发明通过进水连管对多个防护机构输送清水,防护机构内部对桩头进行补水,从而解放人力操作,快捷方便的对桩头进行补水操作;通过加湿单元对桩头实施持续给水养护,使得水流作用于桩头上并给予水流渗透与外散的时间,避免短时间出水过多导致且水流未来得及渗透和外散便流至桩头周围,达不到理想养护效果。
Waterproof device for deep foundation pit in rail transit construction
The invention relates to the technical field of building equipment, and discloses a rail transit construction deep foundation pit waterproof device which comprises a protection mechanism, an upward jacking mechanism is installed on the upper side of the protection mechanism, a wetting mechanism is arranged at the lower end of the upward jacking mechanism, an adjusting mechanism is installed on the left side of the protection mechanism, and a water inlet connecting pipe is installed on the left side of the adjusting mechanism. Clean water is conveyed to the multiple protection mechanisms through the water inlet connecting pipe, water is supplemented to the pile head in the protection mechanisms, and therefore manual operation is liberated, and water is rapidly and conveniently supplemented to the pile head; continuous water supply maintenance is carried out on the pile head through the humidifying unit, so that water flow acts on the pile head, water flow permeation and dispersion time is given, and the situation that due to the fact that water flows out too much in a short time, water flow flows around the pile head before permeation and dispersion, and the ideal maintenance effect cannot be achieved is avoided.
本发明涉及建筑设备术领域,且公开了一种轨道交通施工深基坑防水装置,包括:防护机构,所述防护机构上侧安装有上顶机构,所述上顶机构下端设置有湿润机构,所防护机构左侧安装有调节机构,所述调节机构左侧安装有进水连管。本发明通过进水连管对多个防护机构输送清水,防护机构内部对桩头进行补水,从而解放人力操作,快捷方便的对桩头进行补水操作;通过加湿单元对桩头实施持续给水养护,使得水流作用于桩头上并给予水流渗透与外散的时间,避免短时间出水过多导致且水流未来得及渗透和外散便流至桩头周围,达不到理想养护效果。
Waterproof device for deep foundation pit in rail transit construction
一种轨道交通施工深基坑防水装置
XU CHENGGONG (author) / HUANG YUEQIAO (author) / MA YONGLONG (author) / XIA GAODI (author) / ZHOU SHAOFENG (author)
2023-06-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Waterproof structure for rail transit station and construction method
European Patent Office | 2024
|Deep foundation pit corner waterproof construction method
European Patent Office | 2020
|Waterproof construction method for foundation raft in deep foundation ponding area
European Patent Office | 2024
|Construction method for reinforcing foundation pit of overpass rail transit
European Patent Office | 2022
|