Fishpond section roadbed and soft foundation treatment construction method thereof
The invention discloses a fishpond section roadbed and a soft foundation treatment construction method thereof, and relates to the technical field of constructional engineering. Comprising the following steps: S1, draining accumulated water in a to-be-treated construction area, and forming a non-soaking soft soil layer and a soaking soft soil layer in the construction area; s2, in-situ curing treatment is conducted on the non-water-soaking soft soil layer, and a first curing layer is formed; s3, in-situ curing treatment is conducted on the soaked soft soil layer to form a second curing layer, then roadbed filler is laid on the surface of the second curing layer till the roadbed filler is flush with the first curing layer, and a filler layer is formed; and S4, filling soil on the surfaces of the first curing layer and the filler layer to form a fishpond section roadbed. The non-water-soaked soft soil layer and the water-soaked soft soil layer are respectively treated based on the in-situ curing treatment technology, and transfer of soft soil waste of the fishpond is reduced. And meanwhile, after in-situ soft soil and the pile foundation waste are uniformly stirred, in-situ curing treatment is performed, so that the pile foundation waste is turned into wealth, and the economical efficiency is greatly improved.
一种鱼塘段路基及其软基处理施工方法,涉及建筑工程技术领域;包括以下步骤:S1,排出待处理的施工区域的积水,在施工区域中形成非浸水软土层和浸水软土层;S2,对所述非浸水软土层进行就地固化处理,形成第一固化层;S3,对所述浸水软土层进行就地固化处理形成第二固化层,然后在所述第二固化层表面铺设路基填料至与所述第一固化层平齐,形成填料层;S4,在所述第一固化层和填料层表面填土形成鱼塘段路基。本发明的基于就地固化处理技术对非浸水软土层和浸水软土层分别处理,减少鱼塘软土废料的转运。同时将原位软土与所述桩基废料搅拌均匀后,再进行就地固化处理,实现桩基废料的变废为宝,极大提高经济性。
Fishpond section roadbed and soft foundation treatment construction method thereof
The invention discloses a fishpond section roadbed and a soft foundation treatment construction method thereof, and relates to the technical field of constructional engineering. Comprising the following steps: S1, draining accumulated water in a to-be-treated construction area, and forming a non-soaking soft soil layer and a soaking soft soil layer in the construction area; s2, in-situ curing treatment is conducted on the non-water-soaking soft soil layer, and a first curing layer is formed; s3, in-situ curing treatment is conducted on the soaked soft soil layer to form a second curing layer, then roadbed filler is laid on the surface of the second curing layer till the roadbed filler is flush with the first curing layer, and a filler layer is formed; and S4, filling soil on the surfaces of the first curing layer and the filler layer to form a fishpond section roadbed. The non-water-soaked soft soil layer and the water-soaked soft soil layer are respectively treated based on the in-situ curing treatment technology, and transfer of soft soil waste of the fishpond is reduced. And meanwhile, after in-situ soft soil and the pile foundation waste are uniformly stirred, in-situ curing treatment is performed, so that the pile foundation waste is turned into wealth, and the economical efficiency is greatly improved.
一种鱼塘段路基及其软基处理施工方法,涉及建筑工程技术领域;包括以下步骤:S1,排出待处理的施工区域的积水,在施工区域中形成非浸水软土层和浸水软土层;S2,对所述非浸水软土层进行就地固化处理,形成第一固化层;S3,对所述浸水软土层进行就地固化处理形成第二固化层,然后在所述第二固化层表面铺设路基填料至与所述第一固化层平齐,形成填料层;S4,在所述第一固化层和填料层表面填土形成鱼塘段路基。本发明的基于就地固化处理技术对非浸水软土层和浸水软土层分别处理,减少鱼塘软土废料的转运。同时将原位软土与所述桩基废料搅拌均匀后,再进行就地固化处理,实现桩基废料的变废为宝,极大提高经济性。
Fishpond section roadbed and soft foundation treatment construction method thereof
一种鱼塘段路基及其软基处理施工方法
ZHONG SHAOMIN (author) / YAN HUATANG (author) / YANG YINGDONG (author) / HONG HUARUI (author) / ZHANG GUANGHUI (author) / DAI XIANGUO (author) / SONG JIANGHONG (author) / JING JIACHI (author) / ZHANG XIMING (author)
2023-06-09
Patent
Electronic Resource
Chinese
Roadbed soft foundation compaction treatment construction method
European Patent Office | 2021
|Roadbed soft foundation compaction construction equipment and construction method thereof
European Patent Office | 2024
|Soft soil roadbed treatment pile foundation construction device
European Patent Office | 2023
|Soft foundation roadbed pavement structure and construction method
European Patent Office | 2023
|