Water conservancy bank slope protection engineering gabion modeling construction device and method
The invention discloses a gabion modeling construction device and method for water conservancy embankment slope protection engineering. The construction device comprises a shaping combined steel jacket box; the construction technological process comprises the steps that 1, construction preparation is conducted; step 2, carrying out survey lofting operation; 3, earth excavation operation is carried out; step 4, carrying out lattice jumping construction operation on the gabion; 5, gabion gabion insertion construction operation is carried out; and step 6, carrying out abutment back backfilling operation. Compared with a traditional construction method, the construction method has the advantages that circulating modeling construction operation of gabion box cage installation and stone filling is achieved by adopting the shaping combined steel jacket box and the opposite-pulling steel formwork, the size deformation of the gabion gabion can be effectively avoided in the installation process, the surface and the top face of the formed gabion gabion are smoother, joints are smoother and more vertical, binding is tighter and firmer, and the construction efficiency is improved. Stone is more compact and not prone to deformation, and the internal and apparent quality of gabion construction is effectively ensured. And (2) the economic benefit is obvious.
本发明公开了一种水利堤岸坡防护工程格宾石笼模化施工装置及方法,所述施工设备包括定型组合钢套箱;所述施工工艺流程具有步骤1,进行施工准备;步骤2,测量放样操作;步骤3,进行土方开挖操作;步骤4,格宾石笼跳格施工操作;步骤5,格宾石笼插空施工操作;步骤6,进行台背回填操作。本工法较于传统工法,通过采用“定型组合钢套箱+对拉钢模板”,实现格宾箱笼安装与石料装填的循环模化施工作业,安装过程中能有效避免格宾石笼尺寸变形,成型后的格宾石笼表面及顶面更加平整,接缝更加横平竖直,绑扎更加紧密牢固,石料更加密实、不易变形,有效确保了格宾石笼施工的内部及表观质量。(2)经济效益显著。
Water conservancy bank slope protection engineering gabion modeling construction device and method
The invention discloses a gabion modeling construction device and method for water conservancy embankment slope protection engineering. The construction device comprises a shaping combined steel jacket box; the construction technological process comprises the steps that 1, construction preparation is conducted; step 2, carrying out survey lofting operation; 3, earth excavation operation is carried out; step 4, carrying out lattice jumping construction operation on the gabion; 5, gabion gabion insertion construction operation is carried out; and step 6, carrying out abutment back backfilling operation. Compared with a traditional construction method, the construction method has the advantages that circulating modeling construction operation of gabion box cage installation and stone filling is achieved by adopting the shaping combined steel jacket box and the opposite-pulling steel formwork, the size deformation of the gabion gabion can be effectively avoided in the installation process, the surface and the top face of the formed gabion gabion are smoother, joints are smoother and more vertical, binding is tighter and firmer, and the construction efficiency is improved. Stone is more compact and not prone to deformation, and the internal and apparent quality of gabion construction is effectively ensured. And (2) the economic benefit is obvious.
本发明公开了一种水利堤岸坡防护工程格宾石笼模化施工装置及方法,所述施工设备包括定型组合钢套箱;所述施工工艺流程具有步骤1,进行施工准备;步骤2,测量放样操作;步骤3,进行土方开挖操作;步骤4,格宾石笼跳格施工操作;步骤5,格宾石笼插空施工操作;步骤6,进行台背回填操作。本工法较于传统工法,通过采用“定型组合钢套箱+对拉钢模板”,实现格宾箱笼安装与石料装填的循环模化施工作业,安装过程中能有效避免格宾石笼尺寸变形,成型后的格宾石笼表面及顶面更加平整,接缝更加横平竖直,绑扎更加紧密牢固,石料更加密实、不易变形,有效确保了格宾石笼施工的内部及表观质量。(2)经济效益显著。
Water conservancy bank slope protection engineering gabion modeling construction device and method
一种水利堤岸坡防护工程格宾石笼模化施工装置及方法
LIU MING (author) / ZHANG JUN (author) / LI LINCHUAN (author) / JIANG XIAOPING (author) / LEI MIN (author) / YI CHENGLONG (author) / LUO YAO (author)
2023-06-09
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau