Construction method before installation of tower crane
The invention relates to the technical field of tower crane installation, in particular to a construction method before tower crane installation, which comprises the following steps: step 1) setting a tower crane foundation; (2) configuration and model selection of special tools of the tower crane; (3) selecting the model of mounting auxiliary equipment of the tower crane and arranging the position of the mounting auxiliary equipment; (4) mounting a tower crane; 5, tower crane power supply installation and tower crane grounding setup are conducted, the whole construction method is easy and convenient to operate, the construction period can be shortened, the installation cost is reduced, and the problems that in the conventional tower crane installation process, the construction process is disordered, the construction period is long, and the construction cost is high are solved.
本发明涉及塔机安装技术领域,尤其涉及一种塔机安装前的施工方法,包括以下步骤:步骤1)塔机基础设置;步骤2)塔机的专用工具的配备选型;步骤3)选取塔机的安装辅助设备的型号以及布置安装辅助设备的位置;步骤4)塔机安装;步骤5)塔机电源安装及塔机接地设置,整个施工方法,操作简单,方便,能够缩短工期,降低安装成本,解决了常规的塔机安装过程中,施工流程混乱,施工工期长,施工成本高的问题。
Construction method before installation of tower crane
The invention relates to the technical field of tower crane installation, in particular to a construction method before tower crane installation, which comprises the following steps: step 1) setting a tower crane foundation; (2) configuration and model selection of special tools of the tower crane; (3) selecting the model of mounting auxiliary equipment of the tower crane and arranging the position of the mounting auxiliary equipment; (4) mounting a tower crane; 5, tower crane power supply installation and tower crane grounding setup are conducted, the whole construction method is easy and convenient to operate, the construction period can be shortened, the installation cost is reduced, and the problems that in the conventional tower crane installation process, the construction process is disordered, the construction period is long, and the construction cost is high are solved.
本发明涉及塔机安装技术领域,尤其涉及一种塔机安装前的施工方法,包括以下步骤:步骤1)塔机基础设置;步骤2)塔机的专用工具的配备选型;步骤3)选取塔机的安装辅助设备的型号以及布置安装辅助设备的位置;步骤4)塔机安装;步骤5)塔机电源安装及塔机接地设置,整个施工方法,操作简单,方便,能够缩短工期,降低安装成本,解决了常规的塔机安装过程中,施工流程混乱,施工工期长,施工成本高的问题。
Construction method before installation of tower crane
一种塔机安装前的施工方法
YANG YILIN (author) / YANG DONGHUA (author) / ZHONG LIYING (author) / TAN HUIZHONG (author) / YUAN XIAO (author)
2023-06-09
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Installation and construction method of underwater tower crane
European Patent Office | 2023
|Intelligent early warning tower crane installation construction method
European Patent Office | 2022
|Shallow-water-depth foundation pit tower crane installation and construction method
European Patent Office | 2024
|Construction method for tower crane foundation installation on completed concrete structure
European Patent Office | 2023
|